Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Decision Notice - Approved by Delegation of Authority - RAL26 0002 (As Published)

of 11

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Document Set ID: 24631692
Version: 5, Version Date: 25/03/2026

2803-51047 SRA

Attachment 2—Advice to the applicant

 

 

General advice

 

Terms and phrases used in this document are defined in the Planning Act 2016, its regulation
or the State Development Assessment Provisions (SDAP) (version 3.5). If a word remains
undefined it has its ordinary meaning.

 

Trans|

port noise corridor

 

Mandatory Part (MP4.4) of the Queensland Development Code (QDC) commenced on 01 Sep
2010 and applies to building work for the construction or renovation of a residential building in a
designated transport noise corridor. MP4.4 seeks to ensure that the habitable rooms of Class 1,
2, 3 and 4 buildings located in a transport noise corridor are designed and constructed to
reduce transport noise. Transport noise corridor means land designated under Chapter 8B of
the Building Act 1975 as a transport noise corridor.

For further information on Transport Noise Corridors and assistance with the Queensland
Development Codes. please refer to the website below:
https://www.business.qid.gov_au/industries/building-property-development/building-
construction/laws-codes-standards/queensiand-development-code/transport-noise-corridors

 

Public utility works and connection approval

 

3.

 

The applicant is advised that if any works and/or connections are required to public utility
services within a state-controlled road reserve, approval must be given by the Department of
Transport and Main Roads (DTMR) under the relevant public utility legislation (electricity,
water/sewer, telecommunication), and in accordance with DTMR technical standards (Non-
Transport Utility Management and Design Manual).

Approvals must be obtained prior to commencing any utility works within the state-controlled
road reserve. Please contact the public utility team via [email protected] for further
information on the application and approval process.

 

 

 

State Assessment and Referral Agency Page 4 of 5

Page 9 of 11
Log in to download the original file

Decision Notice - Approved by Delegation of Authority - RAL26 0002 (As Published).pdf · 581 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.