6. The applicant must prepare a metes and bounds building envelope plan indicating the
approved building envelope for Lot 2. The areas must be generally in accordance with the
approved plans. The plans must be submitted in both hardcopy and digital format (dwg) on
GDA 94 zone 56 coordinates. The applicant must submit the plans to Council for approval
prior to the endorsement of the Plan of Survey.
ENGINEERING
Site Access and Driveways
7. An access driveway must be provided extending from the formation in Jirrima Crescent to
the common boundary of proposed Lots 1 and 2. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
a. the works generally as shown on drawings numbered C30-C33 (Revision 2) prepared
by RECOR Consulting dated 15 May 2023
b. any sections of the existing gravel formation that will be affected by flooding up to the
1% AEP event must be sealed
c. all works must be constructed to achieve the flood immunity and trafficability as
described in section 3 of the submitted Stormwater Management Plan – reference
20220089 prepared by Recor Consulting dated May 2023
d. any necessary safety measures or warning signage in the proximity of the watercourse
crossing
e. underground service conduits for all utility services.
8. The party benefitted by the existing easement (Emt A on SP315440) must provide written
approval of the improvements to the access driveway proposed by the applicant. A copy of
the approval must be provided to Council as part of the required operational works
application.
Stormwater Drainage
9. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property.
Services
10. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider. Any
services within the easement for access and services must be provided underground.
11. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
12. Certification must be submitted to Council from all relevant service providers (Energex and
NBN) which certifies that the development has met the requirements of this Decision Notice
and all applicable legislation at the time of construction.
Easements
13. An easement for access and services must be registered against the title of proposed Lot 1
in favour of proposed Lot 2. The easement must be located generally in accordance with the
approved plan.
14. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
15. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
Page 8 of 13
Document Set ID: 22511485
Version: 7, Version Date: 31/07/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.