Skip to the record
Noosa’s premier civic archive.

Council archive · source document

planning report Krimmer - Change · 132004.240120.3

of 15

Text shows just the words. Original shows the document exactly as it was published.

4.0 Planning assessment
4.1     Minor Change Assessment
An assessment against the meaning of minor change and a response about the proposed application
provided thereafter underlined. The Planning Act 2016 defines a minor change as a change to the
approval that:

       i. would not result in a substantially different development*;
              (*In determining whether the proposed change would result in substantially different
              development, the assessment manager or referral agency must consider the
              individual circumstances of the development, in the context of the change proposed.)

              A change may be considered to result in a substantially different development if the
              proposed change:

                -   Involves a new use; or

       Response: The proposed development does not change the existing detached house use.

                -   Results in the application applying to a new parcel of land; or

       Response: No new parcels of land are applicable.

                -   Dramatically changes the built form in terms of scale, bulk and appearance; or

       Response: The design is proposed within generally the same building footprint, bulk and
       layout to that previously approved.

                -   Changes the ability of the proposed development to operate as intended; or

       Response: The site will still be used as a detached house.

                -   Removes a component that is integral to the operation of the development; or

       Response: There are no components being removed from the development integral to the
       operation of the development.

                -   Significantly impacts on traffic flow and the transport network, such as
                    increasing traffic to the site; or

       Response: No change

                -   Introduces new impacts or increases the severity of known impacts; or

       Response: No new impacts are introduced.

                -   Removes an incentive or offset component that would have balanced the
                    negative impact of the development; or

       Response: The proposal does not remove an incentive or offset.

                -   Impacts on infrastructure provisions.

       Response: No change.



                                                                                      Page 10 of 15

Used in these records

About this file

File size
2.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

planning report Krimmer - Change.pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.