Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2020-06-09 Planning & Environment Committee Agenda

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                      9 JUNE 2020


     21.   Where damage occurs to any Council asset as a result of the development works, it
           must be repaired immediately where it creates a hazard that presents risk to person
           or property. Other damage must be repaired prior to completion of works.
     22.   Landscape works must:
           a)    Comply with the approved landscape plan (as annotated).
           b)    Ensure amenity or sales signage and ancillary infrastructure is not installed
                 within the road reserve.
           c)    Ensure permanent irrigation is not installed within the road reserve.
           d)    Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free
                 of foreign matter including anthropogenic waste, rock, soil/sediment
                 contamination and is applied to all planting areas to ensure a minimum 100mm
                 depth once settled.
B.   Find the following matters relevant to the assessment and sufficient reason to approve the
     application:
     1.    The proposal upgrades facilities that are dependent on direct access to the Noosa
           River in order to maintain public safety.
     2.    The proposed works do not intensify the existing operation, within the coastal
           management district and riparian buffer area.
     3.    The proposal is consistent with the zoning (Community Facilities zone) in the draft
           Noosa Plan.
C.     Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.

REPORT
1.   PROPOSAL
The applicant is seeking retrospective approval for a Material Change of Use for a Depot and
Operational Works for removal of vegetation on Lot 157. Vegetation was removed to construct a
depot (shed) for the storage of boats for the Queensland Boating and Fisheries Patrol (QBFP) in
2017. The newly constructed shed replaced a boat shed originally constructed in 1974. The new
shed has a larger footprint and is greater in height than the previous one to accommodate fixed
canopy marine vessels. Refer to Figure 1 – New boat shed.




                                                                                     Page 7 of 55
Log in to download the original file

2020-06-09 Planning & Environment Committee Agenda(PDF, 10MB).pdf · 10.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.