MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume(m³) *specify proposed *specify contractor contractor and
re-use or on-site and recycling landfill site or
recycling methods outlet other disposal
site
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management
table is to be completed by the demolition contractor.
Damage to infrastructure
13. Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
bridges or roadways must be repaired or reinstated to at least pre-existing conditions.
Litter, erosion and sediment control
14. Litter, erosion and sediment control measures must be installed and maintained until
soils are stabilised by turf, vegetation or sealed.
Note: it is an offence under the Environmental Protection Act 1994 to deposit or
potentially allow litter, waste, soil, or other contaminants to enter a waterway or storm
water drainage system (e.g. roadside gutter).
Landscaping Works
17. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan for that specific
area and must include in particular:
a) the works shown on the Approved Landscape Plans (as amended); and
b) dense landscaping to screen the bulk and scale of buildings from residences on
Russell Street and the Noosa River Holiday Park.
18. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
19. All landscape works must be maintained generally in accordance with the approved
design for the life of the development.
OPERATIONAL WORKS
Landscaping Works
20. Landscape works must be supervised, undertaken and certified by qualified persons*.
All works must be completed in accordance with this Decision Notice.
(* Refer to Advisory Note)
Page 6 of 55
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.