Skip to the record
The only place to find full transcripts.

Original source · versioned page text

C2. Eng Report

Attached to the e-mail Response to Information Request - MCU17/0572 & OPW17/0611.

of 189

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 18, section 1. The text section number identifies this passage in the reader.

                                                    Proposed Service Station – 175 Eumundi Noosa Road, Noosaville
                                                                                 Ref: 20769 C R001 Rev 06 09.02.17
                                                                                                    February 2018


                                   Table 2- Pre-development Catchment Details
                                                                         Time of
           Catchment       Area           %                                                 Q10         Q100
                                                      C10      C100    Concentration
               I.D         (m2)       Impervious                                           (m3/s)      (m3/s)
                                                                           (tc)

               EX1         0.197          95%         0.89     1.00           5.0           0.109       0.176


8.5      Post-Development Hydrology
         The total land area considered for the post-development was 1,972 m2. A catchment plan for the
         post-developed site was determined based on preliminary architectural drawings. The post-
         development catchment plan is attached within Appendix C for further information.

         Based on preliminary architectural drawings, the area and fraction impervious of the various
         catchment and sub-catchments were determined. The Coefficient of discharge (C10) value for the
         site was derived from QUDM 2013 Table 4.5.3 and Table 4.5.4. Fy frequency factors were applied to
         determine runoff coefficients for various average recurrence interval (ARI) storm events in
         accordance with QUDM 2013 Table 4.5.2.

         Similar to Section 8.4, QUDM 2013 Section 4.6 was applied to determine the total times of
         concentration (Tc) of 5.0 minutes for catchment C1. Rational Method calculations were performed,
         the results of which can be seen in Table 3

                                   Table 3 - Post-development Catchment Details
                                                                         Time of
           Catchment       Area           %                                                 Q10         Q100
                                                      C10      C100    Concentration
               I.D         (m2)       Impervious                                           (m3/s)      (m3/s)
                                                                           (tc)

               C1          0.197          85%         0.79     1.00           5.0           0.106       0.176


8.6      Detention Analysis and Strategy
         ADG recommends no inclusion of on-site detention measures due to no net increase in post-
         development peak flow.

8.7      Lifecycle Costs
         A lifecycle cost analysis is not a part of the scope of this report. All stormwater infrastructure
         associated with the development shall be maintained and serviced by the owners of the development
         at their own cost.




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                              Page 17
Log in to download the original file

C2. Eng Report.pdf · 8.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.