Proposed Service Station – 175 Eumundi Noosa Road, Noosaville Ref: 20769 C R001 Rev 06 09.02.17 February 2018 Q = (2.78 x10-3) Cy Iy A Equation 1 Q = Peak flow rate (m 3/s) for average recurrence interval Cy = Co-efficient of runoff for ARI of y years (dimensionless) A = Catchment area (ha) Iy = Average rainfall intensity (mm/hr) for a design duration of t hours and an ARI of y years 8.2.3 Catchment Area (A) Catchment areas were measured using AutoCAD, contour surface data and known cadastral boundaries. Catchment boundaries and areas for both the pre-developed and post-developed scenarios can be seen in Appendix A and Appendix C respectively. 8.2.4 Co-efficient of runoff (C) Given the 1I10 for Noosaville of 72.31 mm/hr and the relevant impervious fractions for each catchment, Tables 4.5.3 and 4.5.4 of QUDM 2013 were used to determine the C10 values for the pre-developed and post-developed scenarios. From the C10 values the remaining coefficients of runoff were derived for all storm events up to and including the 1% AEP (100 year ARI) using the frequency factors presented within Table 4.5.2 of QUDM 2013. Please refer to Appendix F for more details. 8.2.5 Time of Concentration The time of concentration (tc) for each catchment was calculated using a combination of sheet flow (using the Friend’s equation – Equation 4.5 of QUDM 2013), channel flow (using figure 4.8 of QUDM 2013) and standard inlet times (using table 4.6.2 of QUDM 2013). Please refer to Appendix F for more details. 8.3 External Catchment No significant upstream catchments act on the proposed site. 8.4 Pre-Development Hydrology The hydrology of the pre-developed catchment has been assessed in accordance with Section 4.0 of QUDM 2013 using the Rational Method. From QUDM Section 4.0, the theoretical calculated peak discharge for storm events ranging from the 63.4% AEP (1 year ARI) to the 1% AEP event (100 year ARI) has been calculated and a summary of the results is presented in Appendix F. The subject site has a total area of 1,972m2 and currently is comprised of a single lot featuring detached commercial dwellings. The site area is comprised predominantly of impervious areas made up of roof and driveway land uses. The Coefficient of discharge (C10) value for the site was derived from QUDM 2013 Table 4.5.3 and Table 4.5.4. Fy frequency factors were applied to determine runoff coefficients for various average recurrence interval (ARI) storm events in accordance with QUDM 2013 Table 4.5.2. QUDM 2013 Section 4.6 was applied to determine a total time of concentration (TC). Due to the existing catchment (EX1) consisting of smaller sub-catchments having short lengths of travel and the site being in a developed urban nature, ADG has adopted a 5-minute time of concentration (Tc) for the existing catchment. Rational Method calculations were performed, the results of which can be seen outlined in Error! Reference source not found.. Please refer to Appendix F for a summary of the Rational Method calculations and all parameters used. BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH Page 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.