Original source · versioned page text
C2. Eng Report
Attached to the e-mail Response to Information Request - MCU17/0572 & OPW17/0611.
Original PDF page 74, section 1. The text section number identifies this passage in the reader.
Noosa Shire Council – The Noosa Plan
Erosion and Sediment Control Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
prevent erosion, construction failure and associated I – Instream works, Sections 14 and 16 International
sedimentation. Erosion Control Association 2008
S2.2 ✓
Temporary vehicular crossings of waterways must be
designed and constructed to convey flows for the 50%AEP To be complied with at detailed
event and remain stable for all rainfall events up to design / construction stages.
10%AEP event.
Solution: ✓ = Acceptable Solution
A/S = Alternative Solution
N/A = Not applicable to this proposal
Page 3 of 3
July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.