SUPERSEDED - Decision Notice - DBW21 0208 [As Published] · DBW21/0208

of 8

Text shows just the words. Original shows the document exactly as it was published.

                      b.      a driveway and driveway crossover design with suitable vertical clearances that will
                              avoid B99 vehicles scraping or bottoming out when entering and exit the subject site;
                              and
                      c.      the construction of the driveway crossover must not create any trip hazards in Council’s
                              road reserve, any reshaping of Council’s road reserve is limited to a maximum 1 in 10
                              grade and must be done so without the use of privately owned retaining structures.
               16.    An arborist report supporting the retention and removal of the existing trees must be
                      submitted and accepted by Council as part of the Operational Works application. The report
                      must be prepared by a suitably qualified arborist.
               17.    The construction of the access driveway must be done under the supervision of a suitably
                      qualified arborist to ensure the remaining vegetation is not adversely affected.
                      Stormwater Drainage
               18.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval, be done so without the use of mechanical pumps or the like and without causing
                      scour or damage to the subject site or any adjoining properties.
                      Easements
               19.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               20.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               21.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Geotechnical Stability
               22.    All works must be carried out in accordance with a Geotechnical Report (or part thereof)
                      prepared by a qualified person* and endorsed through an Operational Works approval.
                      *(Refer to Advisory Note)
                      Earthworks and Retaining Walls
               23.    All earthworks and associated batters must be undertaken in accordance with an Operational
                      Works approval and contained entirely within the subject site unless written permission from
                      the respective landowner(s) is provided to Council.
               24.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               25.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.




                                                                                                         Page 4 of 8
Document Set ID: 22407726
Version: 3, Version Date: 04/05/2023
Log in to download the original file

SUPERSEDED - Decision Notice - DBW21 0208 [As Published].pdf · 175 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.