Council archive · source document
0014C22C.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
column 4 : ee ae : Mammete) STi wr , : Column 3
boy eid mC elitr} , ; . ; Probable solutions (if code assessable) Compliance
fighting purposes. and conforms to Council’s Standards;
OR
$13.2 For areas not in a water service area, each lot has an accessible
dam or a dedicated water tank for fire fighting and contains not less than
5,000 litres per dwelling unit;
AND
$13.3 All tanks are fitted with a coupling suitable for attachment to fire
fighting appliances.
O14 The street and lot orientation facilitates the construction of $14.7 For Community Title Development or urban residential Complies - the layout of the site has been designed to maximise
energy efficient buildings that respond to the local climate conditions. | development each lot contains a rectangular house sife area where the solar orientation of the dwellings.
long axis is within 20 degrees of true North and has minimum dimensions
of
a) __ if the lot is between 450m? and 599m*- 10m x 15m; or
AND b) if the lot is less than 450m? - 9m x 15m.
AND
$14.2 Community Title Development lots are generally rectangular in
shape and have a maximum s/ope of—
a) 10% (1:10); and
015 For residential development, the subdivision design provides b) 5% (1:20) when measured from the front to the rear of the Jot.
for the maximum practicable number of lots with house site areas
that— $15.1 No Solution provided
a) maximise solar access to the north in winter;
b) minimise solar access to the east and west in the summer;
c) maximise access to any prevailing summer breezes; and
d minimise exposure to prevailing winter winds.
[infrastructure
076 Each lot is capable of being serviced by appropriate levels $16.7 Alllots are connected to power supply and telecommunications Complies - Lot able fo be connected relevant services.
of— services;
a) _water supply; AND _
b) reticulated sewerage; $17.1 For lots in urban settlements—power supply and communications
, , infrastructure are provided underground; or
c) stormwater drainage;
d) power supply, and $17.2 For lots elsewhere—power supply and communications
e) telecommunications; infrastructure are provided underground unless—
AND a) located in the Rural Zone or Rural Settlement Zone and where not
O17 The design and provision of public services and utilities, in a Bushfire Hazard Area as defined on Overlay Maps OM1.4-
including sewerage, water, electricity, street lighting and OM9.4;
telecommunication services— b) new low voltage lines can be strung from poles carrying existing
@) meets the needs of users; high voltage lines; or ; ;
b) ensures health, safety and convenience of the community; c) no extensions to the existing reticulation network is necessary; or
d it is necessary to cross a body of water;
* PSP1 details information Council may request including an effluent disposal report.See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0014C22C.001.pdfRelated documentPublic source context ↗
07/0070 - MCU - Boundary Realignment & 2 Detached Houses [As Published]Related documentApplication case desk ↗
07/0070 - MCU - Boundary Realignment & 2 Detached Houses [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.