Council archive · source document
0014C22C.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
@ @
column 4 — : oo a ; column2 | , 5 ; Column 3
Specific Outcomes 7 lt Probable solutions (if code assessable) Compliance
C) protects the natural environmental values of the site and AND ae a ; .
surrounds, including visual amenity and native vegetation; $17.3 Street lighting is provided in accordance with Section 3.19 of PSPS
d) are cost effective over their life cycle: engineering Design Standards ~ Roads, Drainage and Earthworks;
€) _ minimises adverse impacts to the environment (including the | 47.4 For lots not within a sewerage service area—the lot has sufficient area
amenity of the focal area) in the short and long term; and and other attributes to ensure sustainable on-site sewerage disposal’:
f) ensures that the existing systems are upgraded or relocated to
be capable of supporting the proposed development; Advisory note
PSP24 ~ Effluent Disposal details requirements for the design
and siting of effluent disposal systems where located outside a
sewerage service area. Compliance with PSP24 will be considered
as part of Council's assessment of the plumbing and drainage
application,
AND . / .
518.7 Components of the infrastructure that are likely to fail or may result in
contamination are—
€) located above the level of a 1% AEP (1:100 year ARN flood event;
or
b} designed and constructed to exclude water inundation or infiltration
and resist hydrostatic and hydrodynamic forces as a result of
inundation.
O78 Essential public utilities are available and maintain their
function during flood events up to a 1% AEP (1:100 year ARN flood
event.
Electricity supply infrastructure Complies - power able to be supplied to site
O19 Uses and works maintain a safe distance from electrical $19.7 Building footprints are situated clear of any power easements on-
infrastructure including substations, overhead power lines, power site;
poles and transformers. AND
$19.2 Building footprints are not less than 50m from an existing fenced
électricity substatian.
Earthworks and stormwater management :
020 Stormwater run-off is managed so as not to cause any No solution provided Conditions may be imposed if considered appropriate.
adverse impacts on the built or natural environment including
changes in quality, quantity or location of stormwater discharges.
021 Filling or excavation only occurs where it does not adversely No prescribed solution. Conditions may be imposed if considered appropriate.
impact on—
a) watercourses, drainage lines and wetlands; or
b) vegetation on land identified on Biodiversity Overlay Maps
OM1.1-OM9.1; or
* PSP1 identifies information that may be requested by Council including Stormwater Management Plans and Stormwater Master Plans,See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0014C22C.001.pdfRelated documentPublic source context ↗
07/0070 - MCU - Boundary Realignment & 2 Detached Houses [As Published]Related documentApplication case desk ↗
07/0070 - MCU - Boundary Realignment & 2 Detached Houses [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.