RFI - Attachment 3 - Operational Waste Management Plan · MCU22/0094

of 52

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

The recommendations in this OWMP relate to the operational phase of the development. Additional requirements for refuse management during
or after demolition or construction phases are not included and require a dedicated plan.
The provisions outlined in this OWMP are considered appropriate for this type of development. It is noted that the refuse rooms are suitably sized
to accommodate the refuse generated and number of bins proposed based on standard storage and collection methods. The refuse rooms will
also accommodate all options for alternate equipment and disposal methods.

1.3.          Regulatory Considerations
1.3.1.        Council’s Refuse Planning Scheme
The plan satisfies Noosa Council’s requirements by providing the following information:

•        Type and quantity of refuse materials to be generated during the occupancy of the proposed site.
•        Refuse collection, storage, transfer and disposal arrangements during occupancy of the completed development.
•        Recommended operational requirements for the operational phase of the development, and design requirements for the building and refuse
         management facilities.
TTM has referred to Noosa Council’s requirements as outlined in 9.4.10 Waste Management Code and SC6.10 – PSP9 Waste Management of the
Noosa Plan 2020. Table 1.2 below outlines the waste management items addressed to align with Noosa Council’s PSP requirements.
Table 1.2: OWMP Compliance Checklist
    Noosa Council SC6.10.5 – Waste Management Design Criteria (PSP9 Waste Management - Noosa Plan 2020)

    Item    Requirement                                                                                                           Compliance/ Comment
            Preliminary considerations prior to designing waste management facilities may include:
                 a) types of waste generated from the site;
                 b) presence or absence of service staff or on site management;                                                   Complies –
                 c) distance waste needs to be moved to a waste storage area and/or collection area;
    1.
                 d) mechanism or pathway used to move bins to the waste storage area;                                             Details throughout
                 e) the need for a bin wash facility;                                                                             OWMP
                 f) whether the collection service will be kerbside or on private property; and
                 g) whether a central waste storage area will be used prior to relocation of the bin to a bin collection point.




Site: Lot 4, 28 Eenie Creek Road, Noosaville
Reference: 23BRW0003                                                                                                                                    6

Used in these records

About this file

File size
6.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Attachment 3 - Operational Waste Management Plan.pdf · 6.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.