Original source · versioned page text
Appendix Q - Planning Scheme Code Responses
EARTH WORKS CODE
Performance Criteria and Acceptable Solutions
Table 14-51 - Earthworks
ACCEPTABLE SOLUTIONS
(IF SELF-ASSESSABLE) COUNCIL USE
PERFORMANCE CRITERIA SOLUTIONS* COMMENTS
PROBABLE SOLUTIONS ONLY
(IF CODE ASSESSABLE)
14.142 Effects of works
Drainage A/S Refer to PF80 – Cooroy Care Farm Stormwater
O1 Finished surface levels ensure land is S1.1 The finished surface gradient of any Management Plan (Bligh Tanner, May 2018)
free draining. filled or excavated area is within the range
0.5% to 1.5% and drains to Council’s Finished surfaces will kept within 0.5%-1.5%
stormwater infrastructure where available wherever possible and drain towards the creek at
or where stormwater infrastructure is not the rear.
available, toward the street.
Hydraulics N/A Refer to PF80 – Cooroy Care Farm Stormwater
O2 Any change to the level of the land does No solution provided. Management Plan (Bligh Tanner, May 2018)
not have an adverse flooding impact on the
flooding and drainage characteristics off- Works are outside of flood zone from adjacent
site. creek.
Geotechnical considerations For assessable development— A/S Refer to PF80 – Cooroy Care Farm Stormwater
O3 Earthworks do not result in geotechnical S3.1 Filling works are undertaken in Management Plan (Bligh Tanner, May 2018)
instability on the premises or nearby accordance with Section 2.8- Filling of Site
premises. of Council’s PSP5 - Engineering Design Works to be undertaken in accordance with all
Standards- Roads and Drainage & relevant earthworks requirements and project
Earthworks; specifications.
AND
S3.2 Where the filling is for residential A/S Refer to PF80 – Cooroy Care Farm Stormwater
commercial or industrial purposes the Management Plan (Bligh Tanner, May 2018)
works comply with Sections 3 to 6 of AS
3798 - Guidelines for earthworks on Works to be undertaken in accordance with all
commercial & residential development. relevant earthworks requirements and project
specifications.
Local amenity A/S Refer to PF80 – Cooroy Care Farm Stormwater
O4 Earthworks do not cause disturbance to S4.1 The following control measures are Management Plan (Bligh Tanner, May 2018)
the amenity of the neighbouring land. implemented—
(a) regular water spraying of exposed Works to be undertaken in accordance with all
areas to suppress dust; relevant earthworks requirements and project
(b) provision of dust stabilised or sealed specifications.
internal roads;
1 Solution: ✓ = Acceptable Solution
A/S = Alternative Solution Cooroy Care Farm
N/A = Not applicable to this proposal
521 Elm Street and 10-22 Rose Gum Road, Black Mountain Commenced 3 February 2006 – Amended 3 March 2008 Page 1
See the original