Appendix Q - Planning Scheme Code Responses
EARTH WORKS CODE
Performance Criteria and Acceptable Solutions
ACCEPTABLE SOLUTIONS
(IF SELF-ASSESSABLE) COUNCIL USE
PERFORMANCE CRITERIA SOLUTIONS* COMMENTS
PROBABLE SOLUTIONS ONLY
(IF CODE ASSESSABLE)
(c) protective covering of exposed areas
that are left for more than 2 weeks;
and
(d) if there is no valid development permit
for the site, disturbed areas are
revegetated using species identified in
PSP3 – Landscaping Plants and
Guidelines;
AND
S4.2 Earthworks are undertaken only A/S Refer to PF80 – Cooroy Care Farm Stormwater
during the hours of 7am to 6pm, Monday to Management Plan (Bligh Tanner, May 2018)
Friday and 7am to 6pm on Saturday. No
work is undertaken on Sunday or public Works to be undertaken during approved hours
holidays. only
Vegetative Waste A/S Refer to PF80 – Cooroy Care Farm Stormwater
O5 Vegetation cleared from a development S5.1 Cleared vegetation is transported Management Plan (Bligh Tanner, May 2018)
site is disposed of in an environmentally offsite for disposal in an approved green
responsible manner. waste disposal facility; Excess cleared vegetation will be disposed at
OR approved green waste disposal facility
S5.2 Cleared vegetation is mulched on-site A/S Refer to PF80 – Cooroy Care Farm Stormwater
and reused for landscaping of the finished Management Plan (Bligh Tanner, May 2018)
development;
OR Where possible cleared vegetation will be mulched
on site and used for landscaping purposes
S5.3 Cleared vegetation is disposed of for N/A N/A
the purpose of firewood.
Managing contamination risk A/S Refer to PF80 – Cooroy Care Farm Stormwater
O6 Materials used as fill are suitable for S6.1 The fill material is solid clean earth, Management Plan (Bligh Tanner, May 2018)
development of the land and filling or free of putrescible or refuse material,
excavation works do not result in the vegetation, acid sulfate soils, building or Any imported materials will be compliant with all
contamination of land. construction material or other material or relevant standards and project specifications
contaminants;
AND
1 Solution: ✓ = Acceptable Solution
A/S = Alternative Solution Cooroy Care Farm
N/A = Not applicable to this proposal
521 Elm Street and 10-22 Rose Gum Road, Black Mountain Commenced 3 February 2006 – Amended 3 March 2008 Page 2