Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Appendix Q - Planning Scheme Code Responses

of 88

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                                                   EXISTING SERVICES CODE
                                                                                                                                Performance Criteria and Acceptable Solutions



                                                      PROBABLE SOLUTIONS                                                                                       COUNCIL USE
      PERFORMANCE CRITERIA                                                                SOLUTIONS*                      COMMENTS
                                                      (IF CODE ASSESSABLE)                                                                                        ONLY
                                            Drainage and Earthworks.
O2 Maintenance access is provided to all    S2.1 A registered easement in favour of           ✓        S2.1 Complies
sewers, water mains, stormwater drains,     Council is created over all underground                    Easements will be appropriately designed and located
overland flow paths and associated          infrastructure located in private property;                where it is necessary for the purposes of water and
structures.                                 AND                                                        sewer infrastructure.
                                            S2.2 The width of the easement is the             ✓        S2.2 Complies
                                            greater of 3m or the width of the zone of                  As above.
                                            influence;
                                            AND
                                            S2.3 The easement is centred over the             ✓        S2.3 Complies
                                            centreline of the infrastructure.                          As above.




1   Solution: ✓ = Acceptable Solution                                                                                                                               Appendix O
              A/S = Alternative Solution                                                                                                                      Cooroy Care Farm
              N/A = Not applicable to this proposal

521 Elm Street and 10-22 Rose Gum Road, Black Mountain               Commenced 3 February 2006 – Amended 3 March 2008                                               Page 2
Log in to download the original file

Appendix Q - Planning Scheme Code Responses.pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.