Original source · versioned page text
Appendix Q - Planning Scheme Code Responses
EXISTING SERVICES CODE
Performance Criteria and Acceptable Solutions
PROBABLE SOLUTIONS COUNCIL USE
PERFORMANCE CRITERIA SOLUTIONS* COMMENTS
(IF CODE ASSESSABLE) ONLY
Drainage and Earthworks.
O2 Maintenance access is provided to all S2.1 A registered easement in favour of ✓ S2.1 Complies
sewers, water mains, stormwater drains, Council is created over all underground Easements will be appropriately designed and located
overland flow paths and associated infrastructure located in private property; where it is necessary for the purposes of water and
structures. AND sewer infrastructure.
S2.2 The width of the easement is the ✓ S2.2 Complies
greater of 3m or the width of the zone of As above.
influence;
AND
S2.3 The easement is centred over the ✓ S2.3 Complies
centreline of the infrastructure. As above.
1 Solution: ✓ = Acceptable Solution Appendix O
A/S = Alternative Solution Cooroy Care Farm
N/A = Not applicable to this proposal
521 Elm Street and 10-22 Rose Gum Road, Black Mountain Commenced 3 February 2006 – Amended 3 March 2008 Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.