                                                                                                                                      Performance Criteria and Acceptable Solutions




                                                       PROBABLE SOLUTIONS                                                                                              COUNCIL USE
      PERFORMANCE CRITERIA                                                                    SOLUTIONS*                        COMMENTS
                                                       (IF CODE ASSESSABLE)                                                                                               ONLY

Table 14-51
Setbacks and easements                                                                            ✓        S1.1 Complies
O1 Development near a sewer, water           S1.1 The footing of any structure or                          The footing of all buildings are suitably distanced from
main, stormwater drain, overland flow path   building is located clear of the zone of                      sewer and water infrastructure.
or associated structure does not—            influence but no closer than 1.5m
(a) adversely affect the function of the     (measured           horizontally)        from
     service;                                infrastructure including sewers, water
(b) place an additional load on the          mains and stormwater structures;
     service; and                            AND
(c) unduly increase future maintenance       S1.2 No building or structure overhangs              ✓        S1.2 Complies
     costs.                                  the zone of influence;                                        Buildings and structures do not overhang the zone of
                                             AND                                                           influence.
                                             S1.3 Finished surface levels maintain a              ✓        S1.3 Complies
                                             minimum of 600mm of cover, but no                             Proposal complies.
                                             greater than 3m of cover to the
                                             underground infrastructure;
                                             AND
                                             S1.4 If the existing surface level is altered,       ✓        S1.4d Complies
                                             surface level services including manholes                     Proposal will comply.
                                             and inspection points are altered to match
                                             the new surface level;
                                             AND
                                             S1.5 Alterations are constructed in                  ✓        S1.5 Complies
                                             accordance with Sections 3, 4 and 5 of                        Proposal will comply.
                                             PSP6 –Engineering Design Standards —
                                             Water and Sewerage and Section 4 of
                                             PSP5 –Engineering Design Standards –
                                             Roads, Drainage and Earthworks;
                                             OR
                                             S1.6 Existing services are relocated and
                                             the design and construction of the
                                             relocated services is in accordance
                                             Sections 3, 4 and 5 of PSP6 –Engineering
                                             Design Standards — Water and
                                             Sewerage and Section 4 of PSP5 –
                                             Engineering Design Standards – Roads,
1    Solution: ✓ = Acceptable Solution                                                                                                                                      Appendix O
               A/S = Alternative Solution                                                                                                                             Cooroy Care Farm
               N/A = Not applicable to this proposal

521 Elm Street and 10-22 Rose Gum Road, Black Mountain                  Commenced 3 February 2006 – Amended 3 March 2008                                                    Page 1
Log in to download the original file

Appendix Q - Planning Scheme Code Responses.pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.