Appendix Q - Planning Scheme Code Responses
TRANSPORT, ROADS AND DRAINAGE CODE
Performance Criteria and Acceptable Solutions
PROBABLE SOLUTIONS COUNCIL USE
PERFORMANCE CRITERIA SOLUTIONS* COMMENTS
(IF CODE ASSESSABLE) ONLY
to accommodate public transport (g) A combination of the principles in
services; these documents. and
(b) road pavement surfaces—
(i) are durable enough to carry S5.3 ✓ S5.3 Complies
estimated wheel loads of On-road cycling treatment is utilised to Development will comply.
travelling and parked vehicles; provide safe and continuous movement of
(ii) provide for the safe passage of cyclists along a roadway, such as--
vehicles, pedestrians, cyclists, (a) sealed shoulders;
and discharge of stormwater run- (b) wide kerbside lane;
off from contributing catchments (c) exclusive or peak period bicycle lane;
and the preservation of all (d) advisory treatments such as Bicycle
weather access; Awareness Zone;
(c) kerb and channel— (e) shared parking / bicycle lane;
(i) controls vehicle movement by (f) contra flow bicycle lane; and
delineating the carriageway for all (g) bus/bicycle lane.
users;
(ii) conveys road pavement run-off to S5.4 ✓ S5.4 Complies
stormwater drainage in a manner The provision of bicycle lanes at Development will comply.
that allows the road to be intersections is generally in accordance
trafficable in Q100 ARI local with AUSTROADS Part 14, section 5 and
rainfall events; and the Manual of Urban Traffic Control
(d) verges and footpaths provide— Devices (MUTCD) Part 9.
(i) safe access for pedestrians and
cyclists clear of obstructions;
(ii) an access area for vehicles onto
properties;
(iii) a corridor allocated for services
and utilities; and
(iv) additional amenity for minor
roads.
O6 S6.1 ✓ S6.1 Complies
Stormwater drainage infrastructure is Stormwater drainage planning, design See Appendix G – Stormwater Management
planned, designed and constructed to— and construction is in accordance with Report.
(a) be accessible, cost effective and Section 4 of PSP5 Engineering Design
easily maintainable; Standards – Roads, Drainage and
(b) protect downstream capacity; Earthworks; and
(c) protect downstream water quality;
1 Solution: ✓ = Acceptable Solution
A/S = Alternative Solution Cooroy Care Farm
N/A = Not applicable to this proposal
521 Elm Street and 10-22 Rose Gum Road, Black Mountain Commenced 3rd February 2006 - Updated October 2006 Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.