                                                                                                                                       TRANSPORT, ROADS AND DRAINAGE CODE
                                                                                                                                      Performance Criteria and Acceptable Solutions



                                                       PROBABLE SOLUTIONS                                                                                          COUNCIL USE
       PERFORMANCE CRITERIA                                                                  SOLUTIONS*                          COMMENTS
                                                       (IF CODE ASSESSABLE)                                                                                           ONLY
(d) maximise on-site stormwater retention     S6.2                                               ✓        S6.2 Complies
    and retardation; and                      As Constructed data is submitted in                         See Appendix       G    –   Stormwater   Management
(e) convey run-off to stormwater drainage     accordance with Section 6 of PSP5                           Report.
    in a manner that allows roads to be       Engineering Design Standards – Roads,
    trafficable in Q100 ARI local rainfall    Drainage and Earthworks; and
    events.
                                              S6.3                                               ✓        S6.3 Complies
                                              Stormwater drainage planning, design                        See Appendix       G    –   Stormwater   Management
                                              and construction is in accordance with the                  Report.
                                              Queensland Urban Drainage Design
                                              Manual.

O7                                            S7.1                                               ✓        S7.1 Complies
Roads       and     stormwater     drainage   Roads       and    stormwater      drainage                 Proposal will comply.
infrastructure is constructed—                infrastructure    is      constructed     in
(a) in accordance with appropriate            accordance with—
     engineering standards; and               (a) Sections 2, 3 and 4 of PSP5
(b) to minimise adverse environmental              Engineering Design Standards –
     impacts, including from run-off and           Roads, Drainage and Earthworks;
     erosion.                                 (b) Queensland Design Code for
                                                   Residential Streets;
                                              (c) AUSTROADS; or
                                              (d) A combination of the principles in
                                                   these documents; and
                                              S7.2                                               ✓        S7.2 Complies
                                              Erosion and sediment control measures                       Erosion and sediment control measures will be
                                              are designed and implemented in                             implemented in accordance with the appropriate
                                              accordance with the Institution of                          standards.
                                              Engineers       Australia      (Queensland
                                              Division) Soil Erosion and Sediment
                                              Control - Guidelines for Queensland
                                              Construction Sites.

Environmental Protection                                                                         ✓        S8.1 Complies
O8                                            S8.1                                                        Proposal will comply.
Roads       and    stormwater     drainage    Roads and stormwater drainage follow the
infrastructure are located and aligned so     edge of existing disturbed areas, or
as to—                                        alternatively, these works are co-located
1    Solution: ✓ = Acceptable Solution
               A/S = Alternative Solution                                                                                                                         Cooroy Care Farm
               N/A = Not applicable to this proposal

521 Elm Street and 10-22 Rose Gum Road, Black Mountain                  Commenced 3rd February 2006 - Updated October 2006                                                  Page 4
Log in to download the original file

Appendix Q - Planning Scheme Code Responses.pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.