Appendix Q - Planning Scheme Code Responses
WASTE MANAGEMENT CODE
Performance Criteria and Acceptable Solutions
PROBABLE SOLUTIONS COUNCIL USE
PERFORMANCE CRITERIA SOLUTIONS* COMMENTS
(IF CODE ASSESSABLE) ONLY
Table 14-57
Waste separation ✓ S1.1 Complies
O1 S1.1 The proposal will comply.
Development that generates several Construction, operational and demolition
classes of waste is designed so waste is works are planned and managed in
collected, stored and disposed of in a safe accordance PSP1130; and
and ecologically sustainable manner29.
S1.2 ✓ S1.2 Complies
Adequate area is provided for on-site for There is adequate area located on-site for the
the collection and separate storage of collection of waste materials during operational and
recyclable, non-recyclable, vegetative and demolition works.
hazardous materials in their specific
waste streams during construction,
operational and demolition works; and
O2 S2.1 ✓ S2.1 Complies
Waste storage areas provide for adequate Waste storage areas allow for the Waste storage areas will allow for separate storage of
separation of all recyclable and non- separate storage of different waste different waste materials.
recyclable materials. materials for reuse or recycling by—
(a) providing sufficient area to store all
recyclable material and recycling
containers required, and
(b) sign posting the types of waste
stored.
Design and location of waste storage ✓ S3.1 Complies
areas S3.1 Waste storage areas will allow for separate storage of
O3 Waste storage areas are designed and different waste materials.
Waste storage areas are located so that maintained in accordance with PSP 9;
they are convenient and safe to use and and
provide for convenient and safe collection
by service vehicles; and S3.2 ✓ S3.2 Complies
Waste storage areas are designed and Waste storage areas will be designed to comply.
located so they—
(a) are easily accessed and convenient
to use;
1 Solution: ✓ = Acceptable Solution
A/S = Alternative Solution Cooroy Care Farm
N/A = Not applicable to this proposal
521 Elm Street and 10-22 Rose Gum Road, Black Mountain Commenced 3rd February 2006 - Updated October 2006 Page 1