Original source · versioned page text
Appendix Q - Planning Scheme Code Responses
NATURAL HAZARDS OVERLAY CODE
Performance Criteria and Acceptable Solutions
congregation and evacuation; and
S14.4 Works avoid any reductions in on- N/A Not Applicable
site flood storage capacity and contain The site is not identified as being subject to flooding in
within the site any adverse changes, the Flood Hazard Overlay.
including changes to the depth, duration
or velocity of flood waters up to and
including a 1% AEP (1:100 year ARI)
flood event.
O15 Development does not result in S15.1 No solution provided N/A Not Applicable
adverse impacts on people’s safety and The site is not identified as being subject to flooding in
capacity to use land within floodplains. the Flood Hazard Overlay.
Hazardous materials N/A Not Applicable
O16 Public safety and the environment are S16.1 Hazardous materials are The site is not identified as being subject to flooding in
not adversely affected by the detrimental manufactured and stored above the level the Flood Hazard Overlay.
impacts of floodwater on hazardous of a 1% AEP (1:100 year ARI flood event;
materials manufactured or stored in bulk. or
S16.2 Buildings or structures used for the N/A Not Applicable
manufacture or storage of hazardous The site is not identified as being subject to flooding in
materials are designed to prevent the the Flood Hazard Overlay.
intrusion of floodwaters up to the level of a
1% AEP (1:100 year ARI) flood event.
Infrastructure N/A Not Applicable
O17 Sewerage treatment plants maintain S17.1 Components of the sewerage The site is not identified as being subject to flooding in
their function during flood events up to a treatment plants that are likely to fail or the Flood Hazard Overlay.
1% AEP 1:100 year ARI) flood event. may result in contamination are—
(a) located above the level of a 1% AEP
(1:100 ARI) flood event; or
(b) are designed and constructed to
exclude water inundation or infiltration
and resist hydrostatic and
hydrodynamic forces as a result of
inundation.
O18 Community Uses and S18.1 Community Uses and N/A Not Applicable
Infrastructure Uses are able to function Infrastructure Uses are sited and The site is not identified as being subject to flooding in
effectively during and immediately after constructed to ensure that floor levels are the Flood Hazard Overlay.
flood events. not less than the AEP (or ARI) levels
identified below—
(a) Emergency service facilities- 0.2%
AEP (1:500 ARI);
(b) Emergency shelter- 0.5% AEP (1:200
1 Solution: ✓ = Acceptable Solution
A/S = Alternative Solution Natural Hazards Overlay Code.docx
N/A = Not applicable to this proposal
521 Elm Street and 10-22 Rose Gum Road, Black Mountain Page 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.