Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2018-08-07 S&O Agenda - Att 1 to Item 1 - Draft Bridges Asset Management Plan

of 33

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                         Replacement cost for Bridge Conditions by Primary
                                             Material
        $70,000,000.00


        $60,000,000.00


        $50,000,000.00


        $40,000,000.00


        $30,000,000.00


        $20,000,000.00


        $10,000,000.00


                $0.00
                                        Concrete                                    Timber

                                                   1   2    3   4    5


Figure 2: Bridge Asset Condition by Replacement Costs

4.4     Operations
Operational costs for the Bridges are those expenses not specifically targeted towards upgrade,
replacement, maintenance or restoration. These day-to-day operational costs have no effect on
bridge conditions but are necessary to keep the management of bridge assets appropriately utilised
and operating within the organisation.

Typical operational activities include:
•    Utility costs.
•    Salaries.
•    Depreciation.
•    Staff training.

               Actual        Actual       Actual           Budget        Budget      Forecast   Forecast
 Year          2014/15       2015/16      2016/17          2017/18       2018/19     2019/20    2020/21
 Operating      $278,392     $450,409      $315,015        $341,840      $324,826    $340,871   $341,991
               Forecast      Forecast     Forecast         Forecast      Forecast    Forecast   Forecast
 Year          2021/22       2022/23      2023/24          2024/25       2025/26     2026/27    2027/28
 Operating     $343,114 $344,240 $345,370 $346,502 $347,638 $348,776                            $349,918


Table 4: Road Bridges Annual Operations Expenditures (actuals and forecasted budget)


It is estimated that operational costs will rise in the future with increasing overheads and safety costs;
particularly the additional use of plant & equipment. Noosa Council will consider various sustainability
measures to minimise the increase in operational costs.



Asset Management Plan: Road Bridges                                                                   Page 11
Log in to download the original file

2018-08-07 S&O Agenda - Att 1 to Item 1 - Draft Bridges Asset Management Plan(PDF, 2MB).pdf · 2.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.