Skip to the record
Every meeting, every word.

Original source · versioned page text

2018-08-07 S&O Agenda - Att 1 to Item 1 - Draft Bridges Asset Management Plan

of 33

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                  10 Year Asset Renewal Costs
$16,000,000.00


$14,000,000.00


$12,000,000.00


$10,000,000.00


 $8,000,000.00


 $6,000,000.00


 $4,000,000.00


 $2,000,000.00


        $0.00
                 2018   2019   2020     2021   2022     2023   2024     2025   2026   2027   2028     2029
                                           Renewal Cost      Cumulative


Figure 5: Bridges Asset Renewal Costs



4.7     Capital Upgrades and New Assets
There is a need to develop more maturity in the overall assessment and management of our bridge
assets before there is a consideration for further upgrades and expansion. Evidence based data
such as traffic volumes, vehicle types, trunk networks, cost benefits, sustainability, environmental
impacts and overall community benefit are key indicators when planning for capital upgrades and
new bridge assets.

The development of the Noosa Transport Strategy may have indicators that identify when upgrades
or new bridge assets should be considered. In May 2018, an initiative from the transport strategy
identified an integrated long-term transport proposal called ‘e-Noosa’, for the purpose of seeking
funding for long term initiatives. The e-Noosa concept focused on a subset of the components of
the broader Transport Strategy and Vision that could be implemented as an integrated transport
solution.

An initiative of the e-Noosa that proposes upgrade or new bridge assets for Noosa Council is to
duplicate the Garth Prowd Bridge, to include transit lanes and clear ways on Noosa Parade to
improve bus and bike access. There is no priority or timeframe currently proposed for if/or when this
proposal may be considered and will require Council approval.



4.8     Capitalisation of Assets
All new and renewed assets will be acquired and commissioned in accordance with the Noosa
Council Capital Delivery Framework.




Asset Management Plan: Road Bridges                                                                 Page 14
Log in to download the original file

2018-08-07 S&O Agenda - Att 1 to Item 1 - Draft Bridges Asset Management Plan(PDF, 2MB).pdf · 2.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.