Original source · versioned page text
2018-08-07 S&O Agenda - Att 1 to Item 1 - Draft Bridges Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn4.6 Asset Renewals The purpose of developing a renewal plan is to identify assets that need to be replaced to maintain the current level of service. Asset failure due to lack of renewal will affect the capacity to deliver future renewals of bridges and subsequently the service bridges provide to the Noosa Community. Bridge asset renewals are condition based. Recent condition assessments has provided staff the ability to develop a Capital Renewal Program (Annex D lists the current bridges in the 10 year renewal program by asset and year). Bridge assets have an estimated useful life of up to 100 years, it is difficult to forecast the renewal beyond a 20 year period, even with good asset condition knowledge. There are still more bridges to be considered in future renewal plans. However, until all the bridges that require level 3 inspections are completed further development and prioritisation of the renewal program will be carried out. The individual asset components of the bridge assets are yet to be componentised consistently within the T1 asset system. The ongoing asset management maturity and development of the condition assessments and subsequent maintenance and renewal plans relies heavily on the componentisation of all bridge assets. Renewal expenditure is work which does not increase the bridges design capacity but restores, rehabilitates, replaces or renews an existing asset to its original service capacity. Improved condition assessment data capture is currently being developed to include asset renewal considerations based on physical conditions and estimates of remaining useful life of assets to guide and improve renewal programs. Renewal plans are developed to maintain levels of service to ensure assets achieve their optimal useful life before they reach the asset condition range of 5. A renewal program is defined in Annex D and only has bridges that have been identified through the level 3 inspections for renewal. Further development of the renewal program is required to identify the bridges in need of renewal over the next 10 years and beyond. The safety and condition of structures on Council’s road network is critical to the linkage of Noosa’s communities. The trunk road network in the coastal areas is sensitive at peak periods and the failure or part closure of any of those bridge assets will result in a reduction of the levels of service on the community. The graph below depicts the planned renewals by asset class over the next 10 years. There are major renewals in 2018/19 for the Old Noosa Road Timber Bridge and Mary River Road Bridge planning activities on Witta Circle Bridge and Doonella Bridge for future renewals. Other bridges to be assessed for renewal works include the Orealla Bridge and Cooroy Mountain Road Bridge. As the bridge assets age, continued CAs are required to monitor the assets and adjust more defined renewal plans. The graph below enables Council to identify and plan for these significant renewal activities in the shorter term. Further condition assessments will assist in developing a more robust and defined 10-year renewal program. Furthermore, the graph below also identifies the cumulative costs and future investment required in renewing bridges over a 10-year period. The current renewals are identified in Annex D and are reflective in Council’s 10 year Capital Works Program on the adoption of this AMP. Asset Management Plan: Road Bridges Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.