Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2018-08-07 S&O Agenda - Att 1 to Item 1 - Draft Bridges Asset Management Plan

of 33

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
ANNEX A: Measured Levels of Service
 Levels of service

 Bridges: The activities include cyclic inspections and routine scheduled maintenance to
 ensure structures achieve optimum service life.

 Performance     Level of        Measure         Measurement      Target
 Measure         Service                         Criteria

 Reliability     Bridges are     Bridges are     Unplanned        No bridge closures due to
                 operational     fully           maintenance or   asset maintenance failures.
                                 Operational     asset failure
                                 without
                                 defects or
                                 asset
                                 failures

 Quality /       Bridges are     Condition of    Condition        All assets with a score 1, 2 or
 Condition       fit for         Bridge          Rating           3. All assets with score of 4
                 Purpose         Assets                           should be placed on the
                                                                  Capital program for renewal
                                                                  and all assets with a score of 5
                                                                  should be
                                                                  replaced/rehabilitated/renewed
                                                                  or upgraded ASAP.

                                                                  More than 50 or (90%) of the
                                                                  road bridges assets in
                                                                  condition 3 or better.

 Health and      Bridges are     No of           Reported         Zero injuries
 Safety          safe and free   Injuries        Injuries
                 from Hazards

 Legal and       Compliance      Compliance      Audit of Legal   100% Compliant
 Statutory       of Bridge       with Legal,     and Statutory
 Compliance      Management      Statutory       Compliance
                                 Standards
                                 and relevant
                                 codes

 Appearance      Bridges are     Cleanliness     Customer         Less than 5 issues or
 and             clean and       and             Feedback         complaints about poor asset
 Presentation    presentable     maintenance                      appearance and condition per
                 condition       appearance                       year.

                                 Maintenance     Audit of         100% of items in need of
                                 to prescribed   Maintenance      maintenance are performed or
                                 Standards       and inspection   accounted for and prioritised
                                 based on the    activities.      for rectification.
                                 DTMR
                                 Structures
                                 Manual.




Asset Management Plan: Road Bridges                                                              Page 21
Log in to download the original file

2018-08-07 S&O Agenda - Att 1 to Item 1 - Draft Bridges Asset Management Plan(PDF, 2MB).pdf · 2.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.