ORDINARY MEETING AGENDA 15 JANUARY 2015
long term. As a general rule, hydromulch will only be accepted as a “patch” fix
and should comprise no more than 20% of the exposed site area due to the
high risk of failure. Due to the requirement to progressively stabilise exposed
areas, it is not envisioned that this will present any difficulties for an
appropriately managed and compliant site.
Property Notation
MCU14/0077 – Stormwater Treatment Device
The following notation applies to the subject lot:
This property is serviced by a bioretention basin water quality treatment device
that must be maintained in accordance with the document titled Maintaining
Vegetated Stormwater Assets, Version 1 (Water by Design, 2009). Records of
all maintenance activities undertaken on stormwater quality treatment devices
must be kept for a minimum of 5 years and made available to Council upon
request.
B. Find the following are sufficient grounds to justify the decision despite the conflict with
the Planning Scheme:
1. The proposal adds to the range of businesses and employment opportunities in
the Shire Business Centre
2. The trade related warehouse and showroom is more compatible with industrial
uses when compared to typical retail uses and is therefore suitably located as
proposed, being a transitional area between industrial and retail uses in the
Shire Business Centre.
5 APPLICATION FOR BUILDING WORKS WITHIN 4.5 METRE SETBACK SITUATED AT
81 SHOREHAVEN DRIVE, NOOSAVILLE - RAP14/0040
That Council note the report by the Development Planner to the General Committee
Meeting dated 12 January 2015 regarding Application No. RAP14/0040 for a Concurrence
Agency Response situated at 81 Shorehaven Drive, Noosaville and approve the application
in accordance with the following conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Concurrence Agency Response must
be complied with prior to the use commencing, and then compliance maintained at all
times while the use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan, prepared by Date
1416Asbuilt.dwg Asbuilt Building Location, prepared by Sight Surveys 24/11/2014
1410 – 10 B Elevations 3 & 4, prepared by Design to Detail 15-07-14
Performance Bond
3. Security in the form of a cash bond or trading bank guarantee to the sum of $2,000
must be submitted to Council to secure performance of all conditions of this approval.
The bond submitted for PBA14/0018 can be used for this condition. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval
less any costs incurred by Council in respect of enforcing performance of this permit.
Page 16 of 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.