ORDINARY MEETING AGENDA 15 JANUARY 2015
Council reserves the right to require further amendments and/or additions at a
later date should design errors become apparent.
6. Council reserves the right to call up any performance bond held or levy charges
against the property, should emergency works be required to be undertaken by
Council to make the site safe due to inactivity on the development site for
extended periods of time.
7. Should any changes or modifications to the approved plans be required as a
result of construction constraints, a “Request to change an existing approval”
under the Sustainable Planning Act 2009 must be made. Amended plans
clearly indicating the changes must be lodged with this application along with
the appropriate fees.
Prestart, On and Off Maintenance Inspections Request
8. Contact Council on 5329 6244 to arrange a prestart or an inspection giving a
minimum of 5 business days’ notice of preferred inspection time.
9. If Council officers are required to undertake additional inspections of the same
works, a reinspection fee will be applicable in accordance with Council’s Fees
and Charges register applicable at the time.
Erosion and Sediment Control
10. Accepted best practice standards include:
a. the Sunshine Coast Regional Council Manual for Erosion and Sediment
Control V1.2 or other superseding document subsequently adopted by
Noosa Council;
b. Best Practice Erosion and Sediment Control, International Erosion
Control Association (2008)
11. As a general rule, a site is determined to have achieved effective short-term
stabilisation if at the time of the request for “on maintenance”:
a. Methods of stabilisation are:
appropriate for slopes and slope lengths; and
are consistent with best practice environmental management
practices such as in the Manual for Erosion and Sediment Control
or the IECA Manual; and
Stormwater runoff from the site is not currently, and is not likely to
result in visible evidence of sedimentation or erosion, or lead to
water contamination.
12. If at the time of request for “on maintenance”, the method of short-term
stabilisation has not achieved a level of stability that Council's Officers believe
will have a high probability of achieving long term stability, Council Officers may
take the following matters into consideration in determining whether the site is
capable of achieving medium to long-term stability:
a. Evidence that the site has been effectively stabilised in the short term;
b. Evidence that soil has been adequately ameliorated;
c. Evidence that seed of annual and perennial grass species has been
applied at an adequate rate; and
d. That grass seed has germinated at a density that is likely to achieve an
effective grass cover.
For example, while hydromulch can provide an immediate and effective
stabilising cover to soils, the protective cover can be relatively short-lived if
vegetation fails to establish before the thin layer of mulch decomposes. So if
hydromulch is selected as the method of temporary short term stabilisation,
Council Officers will seek to confirm that perennial as well as annual grasses
are well established to reduce the risk of instability of the site in the medium to
Page 15 of 32