ORDINARY MEETING AGENDA 15 JANUARY 2015
Plan No. Rev. Plan, prepared by Date
DD201 J Floor Plan, prepared by Cool Architecture 14 October 2014
DD301 J Roof Plan, prepared by Cool Architecture 14 October 2014
DD401 J Rene Street Streetscape North Elevation, 14 October 2014
prepared by Cool Architecture
DD402 J Eastern Elevation & Western Elevation, 14 October 2014
prepared by Cool Architecture
DD403 J South Elevation, prepared by Cool Architecture 14 October 2014
2864-1 B Cover Sheet, prepared by Construction 15 October 2014
Hydraulic
2864-OP2 C Stormwater Management Plan, prepared by 15 October 2014
Construction Hydraulic
2864-OP3 C Stormwater Quality & Quantity Details, prepared 15 October 2014
by Construction Hydraulic
2864-OP4 A Stormwater Quality Maintenance, prepared by 15 October 2014
Construction Hydraulic
DD701 J Landscaping Plan, prepared by Cool 14 October 2014
Architecture
DD702 J Landscaping Notes & Schedules, prepared by 14 October 2014
Cool Architecture
Building Height
3. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground level.
Performance Bond
4. Security in the form of a cash bond or trading bank guarantee to the sum of
$10,000 must be submitted to Council, to secure performance of all conditions
of this approval, prior to pre-start meeting. The cash bond or trading bank
guarantee will be returned on performance of the conditions of approval less
any costs incurred by Council in respect of enforcing performance of this
permit. Council reserves the right to call upon the bond or guaranteed sum to
effect compliance with conditions.
Street Identification
5. The street address of the development must be clearly visible and discernible
from the primary frontage of the site by the provision of a street number and,
where appropriate, the building name.
Building Appearance
6. All air conditioning units or other mechanical equipment must be fully enclosed
or screened such that they are not visible from the street frontages nor
adjoining properties.
Water & Sewer Connections
7. An underground connection to reticulated water and sewerage must be
provided to the development site in accordance with the standards and
requirements of Northern SEQ Distributor–Retailer Authority (Unitywater).
8. A Certificate of Completion from the Northern SEQ Distributor–Retailer
Authority (Unitywater) must be submitted to Council that certifies an
underground connection to reticulated water and sewerage has been provided
to the development site.
Page 8 of 32