Original source · versioned page text
8.7 PROPOSED Amended Plans
Attached to the e-mail Change to DA (GIA) - MCU16/0140.02.
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 23,400 7,062 18,000 18,000 7,062 23,400
Archclad PVDF Cliptray
aluminium cladding colourbond cladding
precast concrete
wall panel
Building B- stage 2 Building A- stage 1 Building A- stage 1 on steel frame
Building B- stage 2
complete fibrecement cladding
on steel frame. render & paint finish
complete roller shutter
with 1000 high alum
parapet RL14.70 framed balustrading parapet RL14.70
parapet RL14.20
5° 5°
5,000
feature polystyrene
ribs; render finish
2,500
06.21 06.21 06.24 06.18
AMT F
8,850
FL 9.70
FL 9.20 louvre
vent
9sqm
4,200
3,700
3000
FL 5.50
190 block wall Alpolic feature aluminium composite precast concrete wall panel
Thermatech polystyrene awning. FRL 90/90/90
render & paint finish cladding on steel frame
galv steel stair
aluminium framed window and entry door.
powdercoat finish east elevation colourbond roller shutter west elevation
59,000 6,300
Building A- stage 1
complete
parapet RL14.20
5,000
fibrecement cladding
on steel frame. paint finish
8,850
FL 9.20
3,700
FL 5.50
precast concrete wall panel
with feature grooving.
FRL90/90/90
north elevation
59,000
colourbond squareline gutter
& fascia
photovoltaics
by others Building A- stage 1 colourbond Trimdek roof
5° roof pitch
on R2.0 insulation blanket
fibrecement cladding
on steel frame. render & paint finish
parapet RL14.20 complete
5,000
Alpolic feature aluminium composite
06.24 06.24 06.24 06.24 06.24 06.24 06.24 06.24 06.24 cladding on steel frame
FL 9.20 3,000
3,700
3,000
FL 5.50
colourbond cladding 190 concrete blockwork solid core entry door
on steel frame 3000 high in folded steel frame.
FRL90/90/90 paint finish
colourbond roller shutter
south elevation
no. date amendments
A Dec 2016 amended carparking & bio-retention
B Feb 2017 amended facade & roof pitch (5°)
C MAY 17 amended bioretention & carparking
D JUN 1-17 amended carparking & hydrants
E JUL 24-17 amended bioretention & carparking
F JAN-18 amended first floor plan
G APR-19 Building B internals amended
0 2000 5000 10000 20000 H JUL-19 For Construction
scale Client Location Drawing Scale Drawn
MONETA CASSA 2 PTY LTD ELEVATIONS 1:200 @ A2 AM
as trustee 42 HOFMANN DRIVE
Project NOOSAVILLE Drawing no. Page Date
4H
62 hilton terrace
noosaville (07) 5449 9066 PROPOSED SELF-STORAGE 11.0416.4H APR 2016
[email protected] QBSA reg. 65073 DEVELOPMENT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.