2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnFigure 3. The adaptive management cycle showing the outer learning cycle where lessons inform the next formal
phase of planning and implementation. The inner learning loops are small changes that are made based on learnings
that occur between major planning reviews. The inner loops effectively allow progress in the outer loop in both
directions. Reproduced from Webb et al. 20172.
3.2 Code of conduct and procurement principles
TNC is committed and takes seriously its core Values and Code of Conduct and requires all staff and contractors to
live by these Values. They are:
• Integrity Beyond Reproach
• Respect for People, Communities, and Cultures
• Commitment to Diversity
• One Conservancy
• Tangible, Lasting Results
Further information on how our Values and Code of Conduct are executed by staff and supporters can be found on
TNC’s website: https://www.nature.org/en-us/about-us/who-we-are/accountability/code-of-conduct/
All contracts executed with subcontractors as part of the implementation of this Project, will require adherence to
TNC’s Standard Operating Procedures on Purchasing, Conflict of Interest and Anti-Corruption Compliance which
describe in detail TNC’s policies on ethical procurement. These detailed documents are available on request from
2 Webb, J.A., Watts, R.J., Allan, C. and Warner, A.T., 2017. Principles for monitoring, evaluation, and adaptive management of environmental
water regimes. In Water for the Environment (pp. 599-623). Academic Press.
20
BRING BACK THE FISH: PROJECT MANAGEMENT PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.