Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
3.4 Deliverables checklist

Table 4. Deliverable checklist for Objective 1 (to be completed in six monthly, annual and final reports).

      Deliverables                           Measurable outcomes                           Status and notes
                                                                                            (Not Started/In
                                                                                     Progress/Delayed/Completed)
      A1.1 Hiring of full-time Project           •    PM in place
      Manager and allocation of TNC
      and NSC support staff to the
      project
      A1.2 Delivery of Project Plan (this        •    Project Plan completed
      Plan), communication plan, and                  and endorsed
      risk assessment(s)                         •    Comms Plan completed
                                                      and endorsed
                                                 •    Monitoring and
                                                      Evaluation Plan
                                                      completed and endorsed
      A1.3 Establishment of a Project            •    TAG in place
      Technical Advisory Group for               •    Evidence of Kabi Kabi
      shellfish ecosystem restoration                 engagement
      and associated activities
      A1.4 Participation and delivery of         •    9 community
      public education and engagement                 engagement forums
      forums and media statements                •    3 media statements
                                                      released
      A1.5 Annual and six-monthly                •    3 six monthly status
      project reporting                               updates
                                                 •    3 annual reports




                                                                                                                   23
      BRING BACK THE FISH: PROJECT MANAGEMENT PLAN
Log in to download the original file

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.