Original source · versioned page text
2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn3.4 Deliverables checklist
Table 4. Deliverable checklist for Objective 1 (to be completed in six monthly, annual and final reports).
Deliverables Measurable outcomes Status and notes
(Not Started/In
Progress/Delayed/Completed)
A1.1 Hiring of full-time Project • PM in place
Manager and allocation of TNC
and NSC support staff to the
project
A1.2 Delivery of Project Plan (this • Project Plan completed
Plan), communication plan, and and endorsed
risk assessment(s) • Comms Plan completed
and endorsed
• Monitoring and
Evaluation Plan
completed and endorsed
A1.3 Establishment of a Project • TAG in place
Technical Advisory Group for • Evidence of Kabi Kabi
shellfish ecosystem restoration engagement
and associated activities
A1.4 Participation and delivery of • 9 community
public education and engagement engagement forums
forums and media statements • 3 media statements
released
A1.5 Annual and six-monthly • 3 six monthly status
project reporting updates
• 3 annual reports
23
BRING BACK THE FISH: PROJECT MANAGEMENT PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.