Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
*(A5.3) Facilitate a minimum of three study tours of relevant sites in line with objectives and scope of the program in
Australia/US if requested by Noosa Council (flights and incidentals covered separately by Noosa Council,
accommodation and in country travel covered by this Grant).

Timeline: 36 months

    •     TNC and NSC identify objectives for study tour and key personnel
    •     TNC coordinate study tour itinerary and logistics
    •     TNC oversee in country/on site logistics

*(A5.4) Review and feasibility of opportunities for sustainable commercial and recreational fishing management
options for the Noosa River.

Timeline: 36 months

    •     TNC- NSC agree on scope of review and project deliverables
    •     Establish terms of reference for Coda Fellowship
    •     Recruit Coda Fellow
    •     Undertake desktop review, onsite and in person interviews including with stakeholders and State
          Government
    •     Produce draft report
    •     TAG, NSC, Project Technical Advisors provide review
    •     Final report presented to NSC

*(A5.5) Facilitate access to TNC conservation networks and researchers if requested by Noosa Council.

Timeline: 36 months

    •     TNC to provide introductions and facilitate dialogue and expert feedback as required

(A5.6) Promote Noosa Council’s Noosa River Plan and shellfish restoration project in at least one national and one
international conference.

Timeline: 36 months

    •     Potential high-profile conferences identified
    •     Abstract developed, submitted
    •     Presentations provided

Timeline: 36 months

    •     Key messages agreed in Communications Plan
    •     Partnership brochures drafted and finalised
    •     PowerPoint slide content agreed
    •     Incorporate key messages into meetings

Timeline: 36 months



                                                                                                                     38
        BRING BACK THE FISH: PROJECT MANAGEMENT PLAN
Log in to download the original file

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.