Log in to see the plans as drawn*(A5.3) Facilitate a minimum of three study tours of relevant sites in line with objectives and scope of the program in
Australia/US if requested by Noosa Council (flights and incidentals covered separately by Noosa Council,
accommodation and in country travel covered by this Grant).
Timeline: 36 months
• TNC and NSC identify objectives for study tour and key personnel
• TNC coordinate study tour itinerary and logistics
• TNC oversee in country/on site logistics
*(A5.4) Review and feasibility of opportunities for sustainable commercial and recreational fishing management
options for the Noosa River.
Timeline: 36 months
• TNC- NSC agree on scope of review and project deliverables
• Establish terms of reference for Coda Fellowship
• Recruit Coda Fellow
• Undertake desktop review, onsite and in person interviews including with stakeholders and State
Government
• Produce draft report
• TAG, NSC, Project Technical Advisors provide review
• Final report presented to NSC
*(A5.5) Facilitate access to TNC conservation networks and researchers if requested by Noosa Council.
Timeline: 36 months
• TNC to provide introductions and facilitate dialogue and expert feedback as required
(A5.6) Promote Noosa Council’s Noosa River Plan and shellfish restoration project in at least one national and one
international conference.
Timeline: 36 months
• Potential high-profile conferences identified
• Abstract developed, submitted
• Presentations provided
Timeline: 36 months
• Key messages agreed in Communications Plan
• Partnership brochures drafted and finalised
• PowerPoint slide content agreed
• Incorporate key messages into meetings
Timeline: 36 months
38
BRING BACK THE FISH: PROJECT MANAGEMENT PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.