Original source · versioned page text
2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn • Review of existing seagrass information/maps
• Commission seagrass mapping by third party (preferably local university)
• Develop habitat suitability model for seagrass (using same processes as described in Objective 2)
• Commission PhD or alternate research arrangement on practical restoration solutions (preferably local
university)
• Produce executive summary of options/feasibility in final report (Deliverable A1.6)
Table 9. Deliverable checklist for Objective 5 (to be completed in six monthly, annual and final reports).
Deliverables Measurable outcomes Status and notes
(Not Started/In
Progress/Delayed/Completed)
(A5.1) Run workshop with Noosa • Workshop completed.
Council to identify ongoing focus
areas for TNC support.
• Minimum 5 peer review
*(A5.2) Provide technical/peer reports completed during the
review on minimum five three year term of this
plans/reports/studies if requested Agreement, if requested by
by Noosa Council. Noosa Council. If Noosa
Council requests a peer
review, TNC will provide a
minimum of 3 experts who
are qualified in the relevant
area of expertise for Noosa
Council consideration and
Noosa Council’s acceptance
of 1 expert for the peer
review.
*(A5.3) Facilitate a minimum of • Minimum three study tours
three study tours of relevant sites in completed during the three
line with objectives and scope of year term of this Agreement,
the program in Australia/US if if requested by Noosa
requested by Noosa Council (flights Council.
and incidentals covered separately
by Noosa Council, accommodation
and in country travel covered by
this Grant).
*(A5.4) Review and feasibility of • Conservation Action Plan and
opportunities for sustainable Community Workshops
commercial and recreational fishing completed as required.
management options for the Noosa
River.
*(A5.5) Facilitate access to TNC • A number of new
conservation networks and contacts/networks to assist
researchers if requested by Noosa Noosa Council with ongoing
Council.
39
BRING BACK THE FISH: PROJECT MANAGEMENT PLAN
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.