Skip to the record
Accept no imitations.

Original source · versioned page text

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
    •     Review of existing seagrass information/maps
    •     Commission seagrass mapping by third party (preferably local university)
    •     Develop habitat suitability model for seagrass (using same processes as described in Objective 2)
    •     Commission PhD or alternate research arrangement on practical restoration solutions (preferably local
          university)
    •     Produce executive summary of options/feasibility in final report (Deliverable A1.6)

Table 9. Deliverable checklist for Objective 5 (to be completed in six monthly, annual and final reports).


    Deliverables                             Measurable outcomes                           Status and notes
                                                                                            (Not Started/In
                                                                                     Progress/Delayed/Completed)
    (A5.1) Run workshop with Noosa           •   Workshop completed.
    Council to identify ongoing focus
    areas for TNC support.
                                             •   Minimum 5 peer review
    *(A5.2) Provide technical/peer               reports completed during the
    review on minimum five                       three year term of this
    plans/reports/studies if requested           Agreement, if requested by
    by Noosa Council.                            Noosa Council. If Noosa
                                                 Council requests a peer
                                                 review, TNC will provide a
                                                 minimum of 3 experts who
                                                 are qualified in the relevant
                                                 area of expertise for Noosa
                                                 Council consideration and
                                                 Noosa Council’s acceptance
                                                 of 1 expert for the peer
                                                 review.
    *(A5.3) Facilitate a minimum of          •   Minimum three study tours
    three study tours of relevant sites in       completed during the three
    line with objectives and scope of            year term of this Agreement,
    the program in Australia/US if               if requested by Noosa
    requested by Noosa Council (flights          Council.
    and incidentals covered separately
    by Noosa Council, accommodation
    and in country travel covered by
    this Grant).
    *(A5.4) Review and feasibility of        •   Conservation Action Plan and
    opportunities for sustainable                Community Workshops
    commercial and recreational fishing          completed as required.
    management options for the Noosa
    River.
    *(A5.5) Facilitate access to TNC         •   A number of new
    conservation networks and                    contacts/networks to assist
    researchers if requested by Noosa            Noosa Council with ongoing
    Council.


                                                                                                                   39
        BRING BACK THE FISH: PROJECT MANAGEMENT PLAN
Log in to download the original file

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.