Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
units, comprised of shell enclosed in coir netting, were set at 14 sites throughout the estuary and the settlement,
growth and use patterns of river organisms interacting with these units were measures and analysed.

In phase II, the project will apply successful restoration methodologies accredited by the Society for Ecological
Restoration (SER). The project will deploy into two carefully selected sites in the river composite of locally sourced
rock rubble, mixed, in part with dried oyster shell. This substrate will be laid in carefully designed configurations
to maximise it’s potential to recruit oysters naturally and promote oyster survivability. These two sites will be
carefully monitored and evaluated before phase III commences.

In phase III, after analysis of the construction, ecological and social successes and challenges experienced in phase
II, additional substrate will be deployed at the same and/or additional sites in the estuary, as suitable deployment
sites, and community will, allow. This MER Plan is focused primarily on the delivery of Phase II, with refinements
to be added for adoption in Phase III.

More detail about each phase is presented below:

Phase I (2018-2020)
Phase I was delivered by the University of the Sunshine Coast. It entailed a three-year study which installed 14
trial ‘reef’ units consisting of coir bags filled with oyster shell at sites throughout the estuary. The project studied
the structural integrity, oyster recruitment, fish and invertebrate community assemblages and human
interactions with the structures. This project collected important ecological information that will support Phases
II and III – this project.




55 | Bring Back the Fish MER plan 2020 – 2022
Log in to download the original file

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.