Original source · versioned page text
2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnunits, comprised of shell enclosed in coir netting, were set at 14 sites throughout the estuary and the settlement, growth and use patterns of river organisms interacting with these units were measures and analysed. In phase II, the project will apply successful restoration methodologies accredited by the Society for Ecological Restoration (SER). The project will deploy into two carefully selected sites in the river composite of locally sourced rock rubble, mixed, in part with dried oyster shell. This substrate will be laid in carefully designed configurations to maximise it’s potential to recruit oysters naturally and promote oyster survivability. These two sites will be carefully monitored and evaluated before phase III commences. In phase III, after analysis of the construction, ecological and social successes and challenges experienced in phase II, additional substrate will be deployed at the same and/or additional sites in the estuary, as suitable deployment sites, and community will, allow. This MER Plan is focused primarily on the delivery of Phase II, with refinements to be added for adoption in Phase III. More detail about each phase is presented below: Phase I (2018-2020) Phase I was delivered by the University of the Sunshine Coast. It entailed a three-year study which installed 14 trial ‘reef’ units consisting of coir bags filled with oyster shell at sites throughout the estuary. The project studied the structural integrity, oyster recruitment, fish and invertebrate community assemblages and human interactions with the structures. This project collected important ecological information that will support Phases II and III – this project. 55 | Bring Back the Fish MER plan 2020 – 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.