Original source · versioned page text
2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnFigure 1: Map of Phase 1 small scale research locations in the Noosa River estuary, QLD Phase II (2019-2020) Phase II of the project is led by The Nature Conservancy (TNC) in partnership with Noosa Shire Council (NSC), and directly involves the community and key operational partners in the collection and deployment of restoration substrate (including oyster shell), monitoring of oyster recruitment (and related habitat parameters), evaluating success and reporting to interested stakeholders and the wider community. 56 | Bring Back the Fish MER plan 2020 – 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.