Original source · versioned page text
2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnthe benchmark. This scoring will be consistent with those allocated for the ecological and socio-economic target indicators. Evaluation steps Summarise Initially for each performance indicator, where applicable, the data will be compiled and summarised returning mean, standard deviation, standard error, coefficient of variation (CV) and a simple calculation of sample size (n) to understand if increased sampling effort is required. Metrics will also be visualised by plotting time series plots that visualise how the metric has varied through time. Score Following summarising the data a score will be calculated in reference to a benchmark. This benchmark will be either a pre-defined benchmark in reference to a known condition i.e. 50 shellfish per m2 that defines a viable population density similar to that found in natural shellfish ecosystems (Gillies et al. 2017). If no pre-determined benchmark exists, the indicator will be measured against a benchmark defined by the mean of the value of the indicator as measured at control sampling locations. The results will then be standardised by providing % of the measure compared to the benchmark and categorised into one of six score categories (see Figure 8). Trend The trend for each indicator will be assessed by fitting the raw data for each site as a linear model. The significance of the t-value, that assesses whether the coefficient is significantly different to zero will first be examined. If the metric is not significantly different to zero, the slope will then automatically be assigned to the ‘Stable’ category. If slope is significant the value of the slope coefficient is then categorized into one of 6 categories (see Figure 8). Additional analysis Where necessary additional analyses will be undertaken to statistically assess differences of metrics between sites i.e. impact versus control. These analyses will be univariate (Analysis of variance - ANOVA) or multivariate analyses (permutational multivariate analysis of variance) where appropriate. The data will be evaluated using the R language and environment for statistical computing alongside RStudio which allows scripts of code to be created ensuring standard analysis workflows and evaluation products 65 | Bring Back the Fish MER plan 2020 – 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.