Original source · versioned page text
2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnFigure 9: Restoration targets and MER workflow
Data management
The project will follow global best practice in data management as outlined in the British Ecological Society’s Guide
to Data Management in Ecology and Evolution 24. Principles include standardized and consistent procedures to
collect, process, check, validate and verify data. Data and information will be openly shared, proactively released,
licensed to promote re-use and housed on the Australian Ocean Data Network (AODN).
24 Alpert P, Baier A, Baker L, Bartomeus I, Beckerman A, Brophy C, Buckley Y, Burdon R, Canham C, Coulson T, Demes
K, Dray S, Dyer A, Freckleton R, Gibson D, Newton E, O’Hara B, Hill C, Pearse W, Pettorelli N, Piper F, Raby C,
Salguero-Gomez R, Suryawanshi K, Warren P, Wilson K (2014) A Guide to Data Management in Ecology and
Evolution. British Ecological Society, London
68 | Bring Back the Fish MER plan 2020 – 2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.