Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
against specified benchmarks and/or milestones and will form the basis for the evaluation of the indicators that
sit under the project efficiency targets.

Table 2
1. Progress Summaries

Annual progress summaries will be produced outlining the progress of the restoration sites against the targets,
goals and performance indicators. The summaries will be produced annually following completion of monitoring
fieldtrips. The progress summaries will be easily interpreted and include infographic displays aimed at donors,
project partners, restoration practitioners, community groups and the general public.

2.   Technical report

A technical report will be produced that reports on progress against targets, goals and performance indicators
throughout the project. The technical report will be detailed scientific report providing details on the monitoring
data collected and an evaluation of how this relates back to the primary targets for the project. The audience for
the annual technical report is academic and government scientists, project partners, restoration practitioners.

3.   Financial and audited annual project reports

Financial and audited annual reports will be provided to project funders in line with requirements specified within
contracts. This includes cumulative expenditure reports (due 10 business days after predetermined dates
annually) and audited annual reports for each financial year expenditure (due within 3 months after the end of
financial year). Each of these reports will provide a summary of outputs and progress against specified
benchmarks and/or milestones and will form the basis for the evaluation of the indicators that sit under the
project efficiency targets.

Table 2: Project reporting schedule

 Report                                                                       Due date
 Cumulative Expenditure Report #1
 Audited Annual Report #1
 2019-20 Project Summary (Baseline)                                           September 2020
 Cumulative Expenditure Report #2
 Audited Annual Report #2
 2018-19 Project Summary
 Phase 2 Technical Report


Figure 9 provides an outline of the monitoring, evaluation and reporting workflow described in the sections above.




67 | Bring Back the Fish MER plan 2020 – 2022
Log in to download the original file

2020-07-07 P&E Agenda - Item 3 - Attachment 1 - TNC Project Management Plan(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.