Landscape Design Outcomes Specifications for Landscape Works
General Conditions
The proposed design aims to achieve sustainable and aesthetic results through practical solutions. This will be accomplished by applying the landscaping plans
and notes. The design calls for selecting trees, shrubs, and ground-cover plantings around the proposed building and surrounding areas to complement the All landscape construction work must comply with relevant council approvals and adhere to industry best practices.
architecture and help create a sustainable, safe, and functional environment within the development. Any deviations from the design documentation require approval from the project designer before on-site construction.
Erosion and sediment control measures are to be implemented as necessary to prevent detrimental effects on downstream waterways or
The planting design will incorporate the following: neighboring sites.
Site Preparation/Earthworks
Plantings will primarily consist of native endemic species to complement the existing environment and local council landscape design policy.
Prior to commencing work, the contractor must document the existing site conditions.
Surveillance and sightline criteria will be met to ensure safe and easy travel for residents throughout the development site.
All existing and proposed services on the site are to be located and clearly identified.
All building rubbish and harmful materials must be removed from the site and taken to an approved waste location.
Shade trees will be planted in carparking areas, driveways, walkways, and general hardstand areas to provide solar relief where practical and possible.
Landscape areas are to be scarified to a depth of 150mm to promote good growth for turf and planting.
Planting species will be selected for their aesthetic value, sustainability during water-conscious periods, and low maintenance qualities. Materials/Services
All plants selected are from native species listed in Table SC6.3.4.1 "Coastal Beachfront Area Species" of the Noosa Plan 2020. All materials used in the construction of the designed landscape must be of industry-standard quality and sourced sustainably where
possible.
No materials used on site shall be toxic to humans, animals, or plants.
All selected materials must be approved by the client prior to on-site construction.
LANDSCAPING SCHEDULE Service conduits are to be provided to all garden beds for irrigation and drainage purposes.
Conduits for lighting should be provided where required.
Code Scpecies Name Common Name Size Quantity Adequate drainage for planting areas, considering specific site soil conditions, is to be ensured through the use of slotted agricultural
drains (select type for application), overland flow paths within gardens (select river gravel on geofabric material), and surface stormwater
gc1 Austromyrtis Dulcis Midgen Berry 140 mm 231
pits (located in generally concealed positions).
gc2 Blechnum Indicum Swamp Water Fern 140 mm 61
Hardscape
gc3 Dianella Caerulea Flax Lily 140 mm 32
Proposed hardscape items are to be constructed to Australian Standards and relevant Council codes by a suitably licensed contractor.
Workplace Health and Safety regulations must be implemented during the construction phase.
gc4 Grevillea Cooroora Cascade 140 mm 128
Plant Management (AS 2303-2015 Tree Stock for Landscape Use)
gc5 Hibbertia Scandens Snake Vine 140 mm 104
All plant species are detailed within the plant schedule; no substitutions are allowed without prior acceptance by the Council and Project
gc6 Lomandra Verday 140 mm 197 Landscape Architect.
The contractor shall obtain all specified plants from an accredited nursery or other approved source.
gc7 Scaevola Calendulacea Dune Fan Flower 140 mm 27
Plants are to be pre-watered before arriving on site.
Plants must be healthy, hardy, and of good form.
gc8 Viola Hederacea Native Violet 140 mm 94
The root system of each plant should not be root-bound and must be conducive to successful transplantation.
s1 Alpina Caerulea Native Ginger 200 mm 19
All plants are to be pest and disease-free, with containers free from weeds.
Street tree species must comply with NATSPEC and relevant Council conditions.
s2 Banksia Spinulosa Hairpin Banksia 200 mm 2 Stake trees with a minimum of two 50x50 HWD stakes and hessian strap or similar, ensuring no damage to the tree; a 'figure 8' detail is
recommended.
s3 Banksia Robur Swamp Banksia 200 mm 17 No type of stake is to be placed through the rootball of the plant at any time.
Each plant is to have added water crystals to the planting hole and watered in after planting as required.
s4 Asplenium Australasicum Bird's Nest Fern 200 mm 13 Plant stock may be rejected if it does not conform to the above specifications.
s5 Cordyline Petiolaris Palm Lily 200 mm 19 Softscape (AS 4419-2003, Soils for Landscaping and Garden Use; AS 4454-2003, Composts, Soil Conditioners, and Mulches)
s6 Cordyline Stricta Palm Lily 200 mm 63 The setout of all softscape areas must be in accordance with approved plans.
Planting areas are to be mounded to achieve adequate drainage and aesthetic presentation.
s7 Grevillea 'Superb' 200 mm 19 Soil: A good quality, friable, moderately draining, organic-enriched landscaping soil mix shall be imported from an approved source. The
soil should not contain any clay and must be free from contaminants such as weeds, sticks, and rocks. Implementation within garden
s9 Lepidozamia Peroffskyana 200 mm 15 areas should be to a minimum depth of 300mm.
Organic Mulch: Hoop pine mulch, in its variety of forms, is to be supplied and installed to a minimum depth of 100mm. Mulch must be free
s10 Melaleuca 'Claret Tops' 200 mm 14 of foreign matter, including weeds, soil, sticks, and rocks. Avoid placing mulch against the stem or trunk of plants. Grade mulch to be self-
retained within garden edging.
s11 Syzygium 'Aussie Boomer' 200 mm 13 Gravel Mulch: Selected washed river mulch, graded in size and color, is to be used in areas as specified on plans. It will be used to
separate organic mulch from building walls, adjacent paths, and to facilitate drainage within garden beds. The minimum depth is to be
s12 Syzygium 'Resilience' 200 mm 13
twice the diameter of the largest pebble.
t1 Banksia Integrifolia Coastal Banksia 45 L 7 Turf
t1 RETAINED 45 L 1 Turf shall consist of dense, well-rooted, vigorous grass growth with a minimum of 25mm of topsoil.
Turf is to be delivered to the site within 24 hours of being cut.
t2 Banksia Serrata Old Man Banksia 45 L 4 Turf should be free from deleterious material, including weeds, seeds, or roots, including nut grass and oxalis.
Turf shall be supplied in uniform size and in unbroken condition.
t3 Cyathea Cooperi Australian Tree Fern 45 L 7
The moisture level of turf must remain consistent during laying.
Turf is to be laid along contours and pinned if the slope is greater than 1:4.
t4 Cupaniopsis Anacardiodes Tuckeroo 45 L 7
Prepare the subgrade to a level base with an approved topsoil and spread under-turf fertilizer at the recommended rate.
t5 Pandanus Tectorius Screwpine 200 L 3
Turf is to finish level with paths, edges, and curbs after rolling and settlement.
Irrigation (To All Planters & Undercroft Areas)
t6 Waterhouse Floribunda Weeping Lilly Pilly 45 L 5
Irrigation must be installed by a suitably qualified contractor and in accordance with all Council water regulations.
The most water-efficient method of irrigation is to be used, connected to tank supply where possible.
Conduits are to be laid to all garden areas to provide regulated coverage.
Flush and pressure test prior to commissioning.
Provide "as constructed" drawings clearly showing the location of all irrigation components.
NOOSA COUNCIL
Landscape Establishment Period
APPROVED PLAN
The contractor is responsible for the care and maintenance of all landscape works for a period of 13 weeks after completion.
MCU25/0092 & OPW25/0143 Maintenance includes mowing turf, removing and spraying weeds, pruning and trimming shrubs where required, replacing dead or
20 APRIL 2026 diseased plant stock, and ensuring the correct working of the irrigation system.
Water is to be provided to all soft landscaping at a required rate during the establishment period to ensure healthy and vigorous growth.
NOTES: DATE REV Revision ID ISSUE PROJECT: CLIENT: DRAWING NAME: PROJECT No: PHASE: DRAWING No: REV:
23/03/2026 D D Structure Revision
MARTIN ST DAVID & JENIFER BULL Landscaping Notes 005 SD SD 400-00 D
5 MARTIN STREET, PEREGIAN
BEACH, QLD. SCALE:
SCHEMATIC DESIGN DA
COPYRIGHT LAWRIE DESIGN
N/A
GSPublisherVersion 0.13814.100.0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.