23 July 2009
Bunnings Properties Pty Ltd
CARE Conics Pty Ltd
PO Box 1559
FORTITUDE VALLEY QLD 4006
Dear Sir
Negotiated Decision Notice
Integrated Planning Act 1997
I refer to your application and the representations you made in respect to the Decision Notice. On 16
July 2009 Council decided your representations.
Details of the negotiated decision are as follows:
1 APPLICATION DETAILS
Application No: 2007/256
Street address: 178 Eumundi Noosa Road, Noosaville
Real property description: Lot 80 SP 211687
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
Council on 10 July 2008 decided to issue the following type of approval:-
Preliminary Approval for Material Change of Use - Bunnings Warehouse
In relation to representations, Council on 16 July 2009 decided to grant a Development Permit and:
A. Agree to delete Condition 24.
B. Agree to change Conditions 1, 10, 11, 14, 22, 23, 37, 41, 45 & 50.
C. Refuse to change/delete Conditions 8, 15, 16, 18, 19, 35, 51 & 62 for the following reasons:
Condition 8
The relevant Operational Works application forms and fee to allow for the assessment of the
non-complying proposed signage have not been submitted with this application.
Condition 15
A lesser number of shower facilities will not adequately cater for expansion or overflow
demands of cyclists. It is undesirable to have integrated facilities for both males and females,
which would result from a lesser number of shower facilities being provided within the
development.
1 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 19 pages
Page 2
2007/256
Condition 16
The scale of the proposal plans does not allow for compliance with roof pitch and eaves
requirements to be accurately determined.
Condition 18 & 19
The bond is required to secure performance of all conditions of the approval and the bond
amount is reasonable given the amount of works required to be undertaken by this approval.
Condition 35
The condition is intended to ensure that any spaces that are intended to be used by staff are
not utilised in error by a customer, with staff spaces in accordance with AS/NZS 2890.1:2004
being a lesser width and therefore more difficult to access and unsuitable for customer use.
Condition 51
The condition ensures that the existing runoff volumes are maintained as much as is
practicable, as the development must not increase or decrease runoff to the extent that it
adversely affects the downstream ecosystem.
Condition 62
The development (staff and customers) will generate an increase in the need for public
transport facilities in the area. The contribution amount is proportional to the cost of providing
public transport facilities to service the increase in demand generated by the development.
D. Amend Conditions 16, 21 & 62 and Advice Conditions 1 & 2.
E. Include one additional Condition 75.
F. Advise the applicant that Council does not agree to:-
1. Offset the cost of roadworks against the Coastal Major Road Network Infrastructure
Charges Plan (CMRNICP) contributions as no works are planned for this roundabout or
road diversion in the current CMRNICP nor in the Draft PIP and roadworks are
necessitated by the increase in traffic generated by the Bunnings Warehouse;
2. Offset the cost of pathway works as the section of path along the Eumundi Noosa road
frontage has been constructed by Council.
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are numbered:
Plan / Rev. Plan / Document Name Date
Document No.
030 P7 Site Plan – John R. Brogan & 27.05.09
Associates
100 C Ground Floor Plan – John R. Brogan & 01.09.08
Associates
101 C Mezzanine Floor Plan – John R. 01.09.08
Brogan & Associates
2 of 20
Page 3
2007/256
110 C Roof Plan – John R. Brogan & 01.09.08
Associates
120 C Sections – John R. Brogan & 01.09.08
Associates
121 C Sections – John R. Brogan & 01.09.08
Associates
130 D Elevations – John R. Brogan & 14.10.08
Associates
131 D Coloured Elevations – John R. Brogan 14.10.08
& Associates
and as may be amended by these conditions.
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use. These landscape
plans required to be submitted are to denote areas of existing vegetation or existing trees
proposed or required to be retained.
4. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to
be completed prior to the premises being occupied and maintained at all times thereafter and
shall include:-
4.1. Provision for planting of one native canopy tree every 6 car parking spaces within the
car parking area.
4.2. Retention of existing native trees along the Eumundi Noosa Road frontage and those
on the corner of Gateway Drive and Eumundi Noosa Road.
4.3. Planting to visually screen the outdoor nursery area and car parking spaces.
4.4. Screening of any electrical transformers or the like from the road frontages.
5. All cut and fill works shall be finished in a manner that will ensure works visually integrate with
the surroundings to the reasonable satisfaction of Council and include sloped batters to all
road frontages, rather than retaining walls.
6. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
6.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10
metres between edges of heaps.
6.2. Disposal for firewood.
6.3. Disposal for landscaping purposes.
6.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
6.5. The disposal method for clearing works is to be submitted in conjunction with an
application for a Development Permit for Operational Work. The Applicant is advised
that other methods may be considered provided full details of the method are
submitted.
6.6. The Applicant is advised that burning off is an unacceptable method of disposal.
3 of 20
Page 4
2007/256
7. The area identified as ‘water sensitive landscape feature’ on Drawing No. 030 Amendment No.
G prepared by John R Brogan & Associates and dated 3 April 2008 shall be dedicated as
parkland, at no cost to Council.
8. Any advertising sign or device is to comply with Council's policies on advertising.
9. All goods are to be displayed on site within the property boundaries and/or on the premises
approved for the use.
10. All storage areas shall be screened from the street and adjoining properties by landscaping, or
suitable screening devices where landscaping screening cannot be achieved.
11. All materials stored outside of the building, excluding the nursery and receiving canopy areas,
shall not exceed half the height of the on-site building.
12. All mechanical plant and equipment shall be designed and located to visually integrate with
the building design to the reasonable satisfaction of Council.
13. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
14. Secure bicycle racks shall be provided on site to accommodate a minimum of 20 bicycles
comprising 4 stainless steel hoops or U rails for customers and 10 U rails or wall parking
hooks within a secured area for employees. The proposed bicycle racks shall be identified on
the landscaping plans and shall be located to the reasonable satisfaction of Council.
15. End of trip facilities shall be provided within the approved building at a minimum of 30 lockers;
and 4 showers, with change rooms.
16. The building shall comprise a roof pitch of a minimum of 5 degrees and provision made for
eaves a minimum of 600mm wide to at least that part of the building fronting Gateway Drive
and Eumundi Noosa Road.
17. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
18. Security in the form of a cash bond or trading bank guarantee to the sum of $250,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
19. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
20. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
21. The Development Permit for a material change of use of premises lapses if the use has not
happened by 16 July 2013, unless an application to extend the currency is approved by
Council.
4 of 20
Page 5
2007/256
Land Development
Roadworks/Intersection Construction
22. The applicant shall upgrade the Rene Street – Eumundi Noosa Road roundabout and provide
a new road reserve generally in accordance with plans CB-0849-F01 Rev I dated 27 May
2009, CB-0849-F03 Rev C dated 27 May 2009, CB-0849-F04 Rev C dated 27 May 2009, CB-
0849-F05 Rev B dated 27 May 2009, CB-0849-F06 Rev A dated 27 May 2009, CB-0849-
TRN01 Rev C dated 27 May 2009 and CB-0849_TRN02 Rev C dated 27 May 2009. The
works shall be designed and constructed to Council standards for Arterial Roads.
23. The applicant shall modify Gateway Drive and provide a new road reserve generally in
accordance with plans CB-0849-F01 Rev I dated 27 May 2009, CB-0849-F02 Rev D dated 2
June 2009, CB-0849-F05 Rev B dated 27 May 2009, CB-0849-F06 Rev A dated 27 May 2009,
CB-0849-TRN01 Rev C dated 27 May 2009 and CB-0849_TRN02 Rev C dated 27 May 2009.
The works shall be designed and constructed to Council standards for Arterial Roads. All
associated retaining walls, safety rails and fencing shall be located wholly within the proposed
new lot boundaries.
24. Deleted.
25. The frontages of the development site affected by road improvements shall be upgraded by
providing kerb & channel, bitumen road widening and landscaping improvements to the
footpath. All associated and ancillary work including pavement correction to the existing
pavement, drainage works, modification of the footpath, and adjustments to the existing
infrastructure shall be undertaken to complete the roadworks widening.
Vehicle Access
26. Vehicular accesses to the development shall be located generally as indicated on BMD
Consulting Drawing No. CB-0849-F01 Rev B dated 10 April 2008, except if relocation is
required as a result of the amended external roadworks plan.
27. All driveways shall be designed and constructed to Council’s design standards and to grades
that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
movements along the footpath without any step or level difference. Should any driveways be
constructed to grades that do not comply with AS2890.1-2004 and AS2890.2-2002, Council
will require that the driveway be removed and reconstructed to levels that do comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
to have the footpath continue at a constant grade to minimise the potential for pedestrians to
trip or fall.
28. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
the driveway and any associated fencing or vegetation near the driveway shall comply with the
minimum sight line requirements as defined in AS2890.1, section 3.2.4. The applicant shall
demonstrate compliance by illustrating these sight lines on the plans submitted for both
Operational Works approval and Building Works approval.
29. All vehicles shall enter and leave the site in a forward direction.
Loading Areas
30. Loading zones, delivery areas shall be generally as shown on John Brogan & Associates
Drawing No. 030 – G and sized to accommodate the appropriate vehicle expected to utilise
the space.
Car Parking
Off Street
31. Carparking shall be provided within the site generally as shown John Brogan & Associates
Drawing No. 030 – G, except as modified herein.
5 of 20
Page 6
2007/256
32. A minimum of 220 uncovered carpark spaces and 8 motorcycle spaces shall be provided on
site, including clearly defined disabled carpark spaces pursuant to the Building Code of
Australia (in accordance with AS2890.6).
33. The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for
User Class 3A and Class 1 for Staff spaces with allowance for vehicles to enter and leave the
site in a forward gear and with a minimum head clearance (headroom) at any point of 2.2m.
Disabled spaces will be designed in accordance with AS2890.6.
34. All carparking shall be kept, maintained and line-marked in a condition fit for use.
35. All staff carpark spaces shall be clearly defined by line marking each space with the words
“Staff Parking Only” and by sign posting each space with a similar wording.
Frontage Works
36. Footpath improvements such as topsoiling, grassing, and tree planting are required to the
street frontages of the site in accordance with Planning Scheme Policy PSP03 Landscaping
Plants & Guidelines. Grass shall be couch, free of weeds. Shade trees shall be provided
along the pathways that are constructed.
37. Any sections of the existing 3.0m wide concrete path along the Eumundi Noosa Road frontage
of the site that are damaged or made redundant due to the construction of the necessary
roadworks shall be replaced by the applicant and a new 2.0m wide concrete path shall be
constructed along the new road and Gateway Drive frontage of the site. The path works shall
be at no cost to Council, in accordance with Council’s design standards and to an alignment
that protects any significant vegetation or any underground service.
38. Pram ramps shall be installed wherever needed to direct pedestrians across the road and at
the roundabout, but the gaps in the islands shall be at road surface level and without ramps.
39. All paths, pram ramps, driveways and parking areas shall be designed and constructed to
ensure pedestrian safety using non-slip materials, to produce an evenly graded surface finish.
40. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
footpath paving and landscaping such as trees and grasses in accordance with Council’s
Standard specifications prior to commencement of the use permitted by this permit.
41. The developer shall provide a safe connection for pedestrians and cyclists from Eumundi
Noosa Road and Gateway Drive into the development site as shown on the approved plans of
development.
Power
42. The applicant shall be responsible for the relocation of all power services required to be
moved as a result of the works associated with this development.
Environmental Management Plan
43. An Environmental Management Plan shall be submitted to Council in conjunction with any
Operational Works application addressing:
43.1. Construction Management including:
43.1.1. Erosion and Sediment Controls;
43.1.2. Traffic Management;
43.1.3. Dust and Noise nuisance;
43.1.4. Haulage Routes.
43.2. Acid Sulfate Management; and
43.3. Operational Surface Water Management.
6 of 20
Page 7
2007/256
Roof Water & Stormwater Drainage
44. Roof runoff from any new building shall be directed to a rainwater storage system or tank that
is installed to ensure water from the tank is used for external uses (such as watering gardens,
irrigation, ornamental ponds, water features, outdoor cleaning, etc) and for use in flushing of
toilets internal to the building. All rainwater tanks are to be designed and installed in
accordance with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks, and
shall be part of the plumbing application in conjunction with the building approval. The
location and capacity of the tanks shall be in accordance with the approved Surface Water
Management Plan (SWMP) and be clearly shown on the plans submitted for Operational
Works approval and any overflow shall be directed as required by the SWMP.
45. All stormwater drainage (including roof water overflow from the rainwater storage system)
shall be collected and discharged so there is no net increase in stormwater runoff from the site
for up to and including a Q100 rain event.
46. Stormwater drainage permitted to drain from the site shall be discharged to Council’s existing
drainage structures in Gateway Drive. If required, the applicant shall upgrade the existing
drainage system. Plans of the drainage design shall be prepared by a Registered
Professional Civil Engineer and submitted to Council prior to obtaining a Development Permit
for Operational Works. A Development Permit for Building Works shall not be granted until a
Development Permit for Operational Works has been issued in regard to the drainage
scheme.
47. As the site is proposed to be filled, appropriate stormwater drainage pipes shall be installed or
overland flowpaths created within the site to collect and discharge stormwater runoff from all
adjoining properties to prevent additional ponding/flooding on these properties.
48. All site stormwater drainage shall be by means of a gravity system.
49. All stormwater drainage lines including inter-allotment drainage shall be inspected by closed
circuit television (CCTV) prior to commencement of the approved Use.
CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council
following satisfactory completion of construction works. The developer will be responsible for
the full cost of CCTV inspection, including any additional inspection necessary following defect
identification and rectification. This charge is payable prior to the issue of Operational Works
approval and will be determined on the unit rate basis current at the time of approval.
Surface Water Management
50. To ensure that polluted run-off does not enter Council’s stormwater drainage system or the
downstream ecosystem, stormwater run-off from the carparking areas and the driveways shall
be treated and maintained in accordance with an approved Surface Water Management Plan.
The Cardno Surface Water Management Plan dated 8 February 2008 shall be amended to
reflect the conditions of this approval and the modified layout approved herein.
The design, construction and maintenance of treatment measures shall be in accordance with
the Healthy Waterways Water Sensitive Urban Design Technical Design Guidelines for South
East Queensland (2006 or more recent edition).
The amended Surface Water Management Plan shall include a requirement for monitoring to
be undertaken for a period of three years after the commencement of the use. Monitoring
results shall be submitted to Council on a quarterly basis for their records in digital form.
Monitoring results presented to Council shall include:
qualitative statements detailing the presence/absence of scour, sediment and litter
build-up within bioretention basins and inlet and surcharge pits; and
results of water quality monitoring undertaken during rain events up to a Q3 month
event that create a suitable amount of runoff to allow for the collection of water
7 of 20
Page 8
2007/256
samples. Water samples shall be collected and/or sampled for pH and nitrogen,
phosphorus and suspended solids concentrations in accordance with the Queensland
Water Quality Sampling Manual (3rd edition • December 1999 or more recent edition).
Water samples shall be analysed at a NATA accredited laboratory for nitrogen,
phosphorus and suspended solids.
Rectification measures for non-compliance with water quality objectives shall be included in the
Environmental Management Plan.
51. The amended Surface Water Management Plan shall demonstrate that the ecosystem located
downstream will not be adversely affected by water harvesting and detention proposed.
Sewer Mains
52. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
This may require the construction of sewer mains external to the site to connect to an
approved connection point.
53. Any existing sewer mains that traverse the site and are no longer required shall be removed
and capped in accordance with Council’s requirements.
Town Water Supply
54. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
55. The water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
56. The water meter must be located outside the property boundary and in an easily assessable
location to facilitate unhindered reading by Council and/or Council’s contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter
configuration and location must be obtained from Council’s Water & Sewerage Capital Works
Manager prior to lodgement and approval of hydraulic drawings.
Earthworks
57. Filling works required on site shall be carried out in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and so as not to cause the additional ponding of water
on any adjoining lands or the blockage of, or interference with, any natural watercourses.
Detailed site surveys indicating natural surface levels and contours of the adjoining properties
must be provided with the application for a Development Permit for Operational Works for
Filling and Drainage.
This may require the design and construction of drainage pipes and/or an overland flow-path
within the development site that caters for drainage from the adjoining sites for a design storm
with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of
Water encompassing the drainage pipes or overland flow-path will also be required. In this
regard a Development Permit for Operational Works shall be obtained.
Should evidence be provided to Council indicating that no additional ponding of stormwater
will occur on the adjoining properties the requirement for the drainage pipes, overland flow-
path and easement shall not apply.
58. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
any fences to be replaced shall be clearly shown on the plans submitted for Operational
Works approval.
8 of 20
Page 9
2007/256
Acid Sulfate Soils
59. As the site is located below the 20m AHD and above the 5m AHD, any excavation works
3
consisting of 100m or greater which extends below 5m AHD will need to be carried out in
accordance with State Planning Policy 2/02 Planning and Managing Development Involving
Acid Sulfate Soils. In this regard appropriate testing and supporting documentation prepared
by a suitably qualified specialist shall be submitted to Council for approval prior to obtaining a
Development Permit for Operational Works.
Site Stability
60. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or land, and make recommendations on
the type of foundation system(s) best suited for the proposed development. The
recommendations of this report shall be incorporated into the design and construction of the
proposed development.
Erosion and Sediment Control
61. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Contributions Towards Council Infrastructure
62. Monetary contributions shall be paid to Sunshine Coast Regional Council towards the cost of
providing and/or upgrading various infrastructure at the rates applicable at the time of
payment. An estimate only of the contribution amounts under the current Council policies and
requirements is outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park)
$0
(Land dedicated in lieu per condition 7)
PSP16 – Sewerage Headworks Contributions $36,143
PSP17 – Water Supply Headworks Contributions $10,689
PSP20 – Pathway Trunk Network Contributions $14,441
Contribution towards cost of providing and/or upgrading the two bus shelters
$10,000
on Eumundi Noosa Road that will service the development.
TOTAL Contribution Amount = $71,273
Please note, that these amounts are all subject to variations in the Consumer Price Index,
All Groups Brisbane from March 2009 until the date of payment.
All contributions must be paid prior to the commencement of the use.
9 of 20
Page 10
2007/256
General
63. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
63.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
63.2. Disposal for firewood.
63.3. Disposal for landscaping purposes.
63.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
The disposal method for clearing works is to be submitted in conjunction with an application
for a Development Permit for Operational Work. The Applicant is advised that other methods
may be considered provided full details of the method are submitted.
The Applicant is also advised that burning off is an unacceptable method of disposal.
64. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be
submitted in conjunction with an application for a Development Permit for Operational Works.
To avoid conflict with underground pipes or services, all existing and proposed services
required by the development shall be shown on the plans.
65. The Construction Management Plan shall incorporate practices to minimise the risk of damage
occurring to Council services.
66. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
67. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
68. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Environmental Health
69. The developer must provide waste storage and disposal facilities in accordance with Planning
Scheme Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial
Premises”, including an external imperviously paved area correctly sized for all refuse and
recycling containers and suitably screened from public places and neighbouring properties. A
bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer, via
a bucket trap. The drain outlet is to be designed to prevent storm water entry to the sewerage
system and this can be achieved with a nib wall 50mm high and up to 700mm x 700mm wide
(max 0.5m²), or alternatively the waste area can be roofed, or any other design approved by
Council.
70. The development must allow refuse-loading areas to be located off street. All vehicles
associated with the collection of waste/recyclables, shall enter and leave the site in a forward
direction.
71. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9
“Waste Management Multi-Dwellings and Commercial and Industrial Premises”, must be
submitted for the day-to-day operation of the development and approved by Council’s Health
Section prior to issue of development permit for operational works.
10 of 20
Page 11
2007/256
It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9
explaining exactly how to predict waste quantities and design waste areas is available from
Council and the web. The Plan shall include the following information: -
The types of waste that will be generated from the activities approved within the
development.
Estimated volumes or tonnage of both recyclables and waste generated.
Methods to be used for dealing with garden waste.
Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
Description of procedures for getting all waste to the bins; the storage of bins and the
collection of bins by the contractor.
A description of the design details of waste storage and recycling areas including size,
location, elevation and floor plan, methods of bin washing and system to prevent storm
water getting into sewer via the bin wash.
A description of types and volume of waste storage containers to be used.
The waste and recycling storage area shall include the provision of containers for all
waste and recycling materials including putresable matter, non-recycling waste, paper/
cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin
washing facilities connected to sewer.
A detailed description of vehicular access to collect waste. Where collection is off
street, access must allow vehicles to enter and leave the site in a forward direction.
72. A Waste Management Plan (construction and demolition) shall be submitted prior to
demolition, removal or relocation of any building other than a shed.
A Waste Management Plan (construction and demolition) is also required for construction of
15 or more dwelling units or for any business use of greater than 500m².
Waste Management Plans (construction and demolition) are required to be submitted in
accordance with Planning Scheme Policy 11, Waste Management Plans see table below.
Waste storage areas are to provide for adequate separation of all reusable, recyclable and
waste materials. These shall be located so that they are convenient and safe to use. (Refer to
Noosa Council Waste Management Code)
The Plan shall contain the following information:
The site area for the storage and separation of waste is to be shown on the plan
drawings accompanying the application.
A waste management table as indicated below is to be completed showing how waste
material is to be segregated - recycled – reused or disposed.
11 of 20
Page 12
2007/256
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume *specify proposed *specify contractor and
(m³) re-use or on-site contractor and landfill site or
recycling recycling outlet other disposal
methods site
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Plasterboard
Metals - please
specify
Asbestos
Other - please
specify
Note * If a demolition contractor is undertaking works, then the Waste Management table is to
be completed by the demolition contractor.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
effective reuse and recycling of such materials. Additionally Council rewards those who
segregate waste by significantly reducing disposal fees at the landfill some items are free.
Higher gate fees are charged for loads of mixed waste.
73. Noise emission from mechanical equipment (air conditioners, refrigeration equipment or pool
pumps etc) shall comply with the following requirements:
The equipment shall be installed and located in a manner that prevents excessive noise in
accordance with Council’s Local Law No. 12 - Control of Nuisances. Infringement Notices (on-
the-spot fines) may apply for offences.
A person must not use equipment on any day if it makes or causes noise to be made –
From 10pm to 7am: More than the lower of either –
40 dB(A)
3 dB(A) above the background noise level
No audible noise for pool pumps apply during these hours.
From 7am to 7pm: More than the lower of either –
50 dB(A)
5 dB(A) above the background noise level
From 7pm to 10pm: More than 3 dB(A) above the background noise level.
74. Submission of written certification from a suitably qualified person confirming that the noise
levels from all mechanical equipment comply with the cause above when measured at either
the residential boundary or outside the most exposed part of an affected building, whichever is
the closest to the equipment.
12 of 20
Page 13
2007/256
The assessment and certification is required immediately after installation of the equipment
and prior to any occupation of the building, and in a format approved by Council. This
assessment must take into account noise from any other fixed equipment on the property e.g.
swimming pool pump, heating/cooling equipment, etc that may increase the overall noise level
emitted.
Advice: It is highly recommended that the person you engage to certify the installation is
involved at the plan development stage so they can recommend where this equipment is best
located. They can also advise about noise enclosures and can make other suggestions to
avoid noise problems. It is a lot more costly to try and deal with noise problems after
everything is built.
75. A minimum 1 metre wide landscape area shall be provided adjacent to the outdoor nursery
and the site’s boundary to Gateway Drive
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
030 P7 Site Plan – John R. Brogan & 27.05.09
Associates
100 C Ground Floor Plan – John R. Brogan & 01.09.08
Associates
101 C Mezzanine Floor Plan – John R. 01.09.08
Brogan & Associates
110 C Roof Plan – John R. Brogan & 01.09.08
Associates
120 C Sections – John R. Brogan & 01.09.08
Associates
121 C Sections – John R. Brogan & 01.09.08
Associates
130 D Elevations – John R. Brogan & 14.10.08
Associates
131 D Coloured Elevations – John R. Brogan 14.10.08
& Associates
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Advice Conditions
1. The applicant is advised that development contributions and infrastructure charges applicable
to this development approval have been based on the following Uses Class/ Uses and
applicable quantities:-
13 of 20
Page 14
2007/256
Existing Development Approved Development
Approved Use Class / Approved
Existing Use Class / Use Existing Quantity
Use Quantity
Industrial Business Type
2
2 - Production, alteration, 1,450 m use area
repackaging and repairing
2
+ + Retail Business Type 6 5,740 m use
2
Retail Business Type 3 2,240 m use area - Hardware Store area
- Landscape and rural + +
2
+ Additional remaining credit for water Retail Business Type 7 1,815 m use
headworks given from balance of 2007/1626 Re: - Garden Centre area
previous water & sewerage headworks
contributions acquired from call in of bond
applicable to Rezoning Deed, R 228
2. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $716,439 and is subject to variations in the
Consumer Price Index, All Groups Brisbane from MARCH 2009 until the date of payment. An
Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated
Planning Act 1997.
3. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
4. Digital detailed designs including drawings, calculations and specifications shall be submitted
with any application for a Development Permit for Operational Works in respect of roadworks
and stormwater drainage works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the
proposed cadastre layout is to be submitted in conjunction with any application for Operational
Works. The design shall be in accordance with Council’s Planning Scheme Policy PSP05 –
Engineering Design Standards – Roads, Drainage and Earthworks.
5. To facilitate production of As Constructed drawings it is suggested that all design drawings are
submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
use of ADAC are available at www.adac.com.au).
6. The applicant is advised that a Compliance Permit for all plumbing and drainage works within
the boundaries of the development site shall be obtained from Council’s Plumbing Services
Section prior to obtaining a Development Permit for Building Works.
7. The applicant is advised that this development may require the provision of fire hydrants and a
booster pump in accordance with the Building Code of Australia, and consultation may also be
needed with Queensland Fire Services to ensure suitable fire fighting infrastructure is
provided. To this end any necessary fire hydrants shall be clearly shown on the plans
submitted for both Operational Works and Building Works approval and if a booster pump is
deemed necessary, the plans shall indicate where the fire truck is to be accommodated in
order to provide boosting to the water supply.
8. Approval for the Underground Petroleum Storage System should be obtained under the
Dangerous Goods Safety Management Act 2001 and the Environmental Protection Act 1994.
The application for such approval should be lodged with Council’s Environmental Health
Section and includes an assessment by a competent person of the site’s class pursuant to
Council’s “Operators Compliance Guide for Petroleum Product Storage”.
14 of 20
Page 15
2007/256
9. An annual licence is required from Council’s Environmental Health Section with respect to the
storage of flammable/combustible liquids in excess of the minimum amounts permitted under
the Dangerous Goods Safety Management Act 2001. Application for a DGSM licence should
be made at the time of submission of a development application for building works and you
must include all relevant plans and specifications.
10. The development should be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting, air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any
other emissions in accordance with the nuisance provisions of the Environmental Protection
Regulation 1998 or Council’s Local Law No. 12 – Control of Nuisances.
11. All refrigeration plant including motors, should be situated within the building or suitably
provided with noise reduction measures and located as to prevent a noise nuisance in
accordance with the nuisance provisions of the Environmental Protection Regulation 1998.
On the spot fines apply for such offences.
12. Noise from building works associated with commercial and or industrial development should
comply with the following –
12.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
12.2. All reasonable measures are taken to minimise noise emissions.
12.3. Not permitted on Sunday or public holidays.
13. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
cement, concrete, builder’s waste or rubbish should not be permitted to enter or be placed
where it could reasonably be expected to move into a roadside gutter, storm water drain or a
watercourse. On the spot fines apply for such offences.
14. The plans for the proposed building work have not been assessed for compliance with the
requirements of the Building Code of Australia as they relate to people with disabilities. Your
attention is drawn to the matter that either or both the Disability Discrimination Act 1992
(commonwealth) and the Anti-Discrimination Act 1991(Queensland) may impact on the
proposed building work.
Noosa Council recommends that the following matters be considered to address equitable
access and facilities in the building:-
14.1. The building and environs should be designed to meet the requirements of the Human
Rights and Equal Opportunity Commission “Advisory Notes on Access to Premises”
and AS1428.2;
14.2. Applicants should be aware that a “Disability Standard on Access to Premises is being
developed and most likely will result in changes to the Building Code of Australia;
14.3. Any services and facilities in the building complex must allow independent, dignified
and equitable use of the services and facilities for all people.
15. This proposal has not been assessed in relation to the spread of fire between properties /
buildings. It is the building certifiers responsibility to assess the requirements for fire services,
fire separation and appropriate methods of construction as part of the building works approval
process. Referral to the Queensland Fire and Rescue Service (QFRS) may be required as
part of the Building Approval process.
16. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if
the cost of operational works exceeds $80,000, then a portable long service leave levy is
required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
the approved form issued by the Building and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory
declaration outlining the cost of the operational works must be submitted to Council with the
lodgement of any application for operational works over the site.
15 of 20
Page 16
2007/256
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All Building Works
Development Permit for Operational Landscaping, Carparking and Access, Site Civil
Works Works (including Earthworks), Roadworks,
Stormwater Drainage, Frontage Works, Sewer
Reticulation (including New Mains, Relocations,
Diversions, Pump Stations and Rising Mains), Water
Reticulation, Site Filling, Erosion & Sediment Control
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Advertising Devices Code
12 SUBMISSIONS
There were two (2) properly made submissions about the application. In accordance with Integrated
Planning Act 1997, the name and address of the principal submitter for each properly made
submission is provided and attached.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
1. There is a continuing significant planning need for a mega hardware store in the Noosa area,
which will improve the range of hardware and related services available to residents, trades
persons and businesses;
2. The proposed Bunnings Warehouse will not adversely impact upon the economic viability of
the Shire Business Centre;
16 of 20
Page 17
2007/256
3. The proposed use has a significant hardware component, which is identified as a consistent
use in the industrial zone under The Noosa Plan; and
4. The proposed retail component of a Bunnings Warehouse is associated with the hardware use
and this is consistent with many other hardware stores in which these types of business have
expanded beyond the traditional retailing of hardware and trade supplies.
14 RIGHTS OF APPEAL
You have continuing appeal rights in respect of Council’s decision on your application. Refer Section
4.1.27. of the Integrated Planning Act 1997.
Please note that the Development approval does not take effect and cannot be acted upon, until the
end of the submitter’s appeal period.
15 OTHER DETAILS
Please note that an Infrastructure Charge in accordance with the Coastal Major Road Network
Infrastructure Charges Plan has been triggered by the approval of this development application. An
Infrastructure Charge Notice is attached in compliance with Chapter 5 of the Integrated Planning Act
1997
Should you wish to obtain more information about Council’s decision, electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Kerri Coyle
Coordinator Planning Applications (North)
Decision Notice History
10 July 2008 - Original Decision Notice.
16 July 2009 - Negotiated Decision Notice
with changes to Conditions
1, 10, 11, 14, 22, 23, 37,
41, 45 & 50.
Deletion of Condition 24.
Amendment to Conditions
16, 21 & 62 and Advice
Conditions 1 & 2 and an
additional Condition 75.
17 of 20
Page 18
2007/256
List of Submitters
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
Lee Meiklejohn
PO Box 1064
MOOLOOLABA QLD 4557
Melco Mitre 10 Home & Timber
CARE Harrison Grierson Consultants Pty Ltd
GPO Box 1064
BRISBANE QLD 4001
18 of 20
Page 19
2007/256
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated (6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
for the application are not available against the part of
Division 8 - Appeals to court relating to the approval that represents the concurrence agency’s
development applications response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application may 4.1.29.(1) An advice agency may, within the limits of its
appeal to the court against any of the following- jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application if-
application; (a) the development application involves impact
(b) a matter stated in a development approval, including any assessment; and
condition applying to the development, and the
(b) the advice agency told the applicant and the
identification of a code under section 3.1.6;1
assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a relevant period; days after the day the decision notice or negotiated
(e) a deemed refusal. decision notice is given to the advice agency as a
(2) An appeal under subsection (1)(a) to (d) must be submitter.
started within 20 business days (the “applicant’s appeal Appeals for matters arising after approval given
period”) after the day the decision notice or negotiated (co-respondents)
decision notice is given to the applicant.
4.1.30.(1) For a development approval given for a
(3) An appeal under subsection (1)(e) may be started at development application, a person to whom any of the
any time after the last day a decision on the matter should following notices have been given may appeal to the
have been made.
court against the decision in the notice-
Appeals by submitters
(a) a notice giving a decision on a request for extension
4.1.28.(1) A submitter for a development application may of the relevant period for an approval;
appeal to the court about-
(b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including any minor change to an approval.
conditions (or lack of conditions) or other provisions
(2) The appeal must be started within 20 business
of the approval; or
days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval. the person.
(2) The appeal must be started within 20 business (3) Subsection (1)(a) does not apply if the approval
days (the “submitters appeal period”) after the day the resulted from a development application (superseded
decision notice or negotiated decision notice is given to planning scheme) that was assessed as if it were an
the submitter. application under a superseded planning scheme.
(3) If a person withdraws a submission before the (4) Also, a person who has made a request
application is decided, the person may not appeal the mentioned in subsection (1) may appeal to the court
decision. against a deemed refusal of the request.
(4) If an application involves both impact assessment (5) An appeal under subsection (4) may be started at
and code assessment, appeal rights for submitters are any time after the last day the decision on the matter
available only for the part of the application involving should have been made.
impact assessment.
Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application
(no co-respondents)
are available only for the aspects of the development that
would have required public notification under the 4.1.31.(1) A person to whom any of the following notices
repealed Act. have been given may appeal to the court against the
decision in the notice-
(a) a notice giving a decision on a request to change or
cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local
planning instrument)
19 of 20
Page 20
2007/256
(b) a notice under section 6.1.442 giving a decision to (c) the decision to give a preliminary approval when a
change or cancel a condition of a development development permit was applied for;
approval. (d) the length of a period mentioned in section 3.5.21
(2) The appeal must be started within 20 business relevant period;
days after the day the notice of the decision is (e) a deemed refusal.
given to the person.
(2) An appeal under subsection (1)(a) to (d) must be
(3) Also, a person who has made a request started within 20 business days (the “applicant’s appeal
mentioned in subsection (1)(a) may appeal to the period”) after the day the decision notice or negotiated
court against a deemed refusal of the request. decision notice is given to the applicant.
(4) An appeal under subsection (3) may be started at (3) An appeal under subsection (1)(e) may be started
any time after the last day the decision on the at any time after the last day a decision on the matter
matter should have been made. should have been made.
Appeals against decisions to change approval conditions The Registrar for the Building and Development
under the repealed Act Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court 4.1.36 Appeals about particular infrastructure
against- charges
(a) the decision; or (1) This section applies to a person who has been
(b) a deemed refusal of the application. given, and is dissatisfied with, an infrastructure charges
notice or a regulated State infrastructure charges notice.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of (2) The person may appeal to the court against the
the decision is to be given to the person. notice.
(3) An appeal under subsection (1)(b) may be started (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter after-
should have been made. (a) if the notice is given because of a development
Appeals against local laws approval or master plan approval-the day the
applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the (b) otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the (4) An appeal under this section may only be about-
planning scheme may appeal to the court against the (a) whether a charge in the notice is so unreasonable
decision or the conditions applied. that no reasonable relevant local government, State
(2) The appeal must be started within 20 business infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the have imposed it; or
applicant. (b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the under this section can not be about the methodology
Integrated Planning Act 1997 as follows: used to establish the charge in the relevant infrastructure
charges schedule or regulated State infrastructure
Division 3 – Appeals to tribunals relating to
charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval, including
any condition applying to the development, and the
identification of a code under section 3.1.6;3
2
Section 6.1.44 (Conditions may be changed or cancelled
by assessment manager or concurrence agency in certain
circumstances)
3
Section 3.1.6 (Preliminary approval may override local
planning instrument)
20 of 20
Used in these records
Negotiated Decision Notice - 010.2007.00000256.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 101 KB (small file)
- File type
No other editions are linked here.