Acid Sulfate Soils
59. As the site is located below the 20m AHD and above the 5m AHD, any excavation works
3
consisting of 100m or greater which extends below 5m AHD will need to be carried out in
accordance with State Planning Policy 2/02 Planning and Managing Development Involving
Acid Sulfate Soils. In this regard appropriate testing and supporting documentation prepared
by a suitably qualified specialist shall be submitted to Council for approval prior to obtaining a
Development Permit for Operational Works.
Site Stability
60. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or land, and make recommendations on
the type of foundation system(s) best suited for the proposed development. The
recommendations of this report shall be incorporated into the design and construction of the
proposed development.
Erosion and Sediment Control
61. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Contributions Towards Council Infrastructure
62. Monetary contributions shall be paid to Sunshine Coast Regional Council towards the cost of
providing and/or upgrading various infrastructure at the rates applicable at the time of
payment. An estimate only of the contribution amounts under the current Council policies and
requirements is outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park)
$0
(Land dedicated in lieu per condition 7)
PSP16 – Sewerage Headworks Contributions $36,143
PSP17 – Water Supply Headworks Contributions $10,689
PSP20 – Pathway Trunk Network Contributions $14,441
Contribution towards cost of providing and/or upgrading the two bus shelters
$10,000
on Eumundi Noosa Road that will service the development.
TOTAL Contribution Amount = $71,273
Please note, that these amounts are all subject to variations in the Consumer Price Index,
All Groups Brisbane from March 2009 until the date of payment.
All contributions must be paid prior to the commencement of the use.
9 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - 010.2007.00000256.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 101 KB (small file)
- File type
No other editions are linked here.