Negotiated Decision Notice - 010.2007.00000256.001 [As Published] · 132007.256
2007/256
samples. Water samples shall be collected and/or sampled for pH and nitrogen,
phosphorus and suspended solids concentrations in accordance with the Queensland
Water Quality Sampling Manual (3rd edition • December 1999 or more recent edition).
Water samples shall be analysed at a NATA accredited laboratory for nitrogen,
phosphorus and suspended solids.
Rectification measures for non-compliance with water quality objectives shall be included in the
Environmental Management Plan.
51. The amended Surface Water Management Plan shall demonstrate that the ecosystem located
downstream will not be adversely affected by water harvesting and detention proposed.
Sewer Mains
52. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
This may require the construction of sewer mains external to the site to connect to an
approved connection point.
53. Any existing sewer mains that traverse the site and are no longer required shall be removed
and capped in accordance with Council’s requirements.
Town Water Supply
54. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
55. The water connection to the water reticulation system shall extend to the property boundary
and be metered. All fees for the supply of water meters shall be paid to the Council.
56. The water meter must be located outside the property boundary and in an easily assessable
location to facilitate unhindered reading by Council and/or Council’s contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter
configuration and location must be obtained from Council’s Water & Sewerage Capital Works
Manager prior to lodgement and approval of hydraulic drawings.
Earthworks
57. Filling works required on site shall be carried out in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and so as not to cause the additional ponding of water
on any adjoining lands or the blockage of, or interference with, any natural watercourses.
Detailed site surveys indicating natural surface levels and contours of the adjoining properties
must be provided with the application for a Development Permit for Operational Works for
Filling and Drainage.
This may require the design and construction of drainage pipes and/or an overland flow-path
within the development site that caters for drainage from the adjoining sites for a design storm
with an Average Recurrence Interval of 1 in 100 years. A private easement for the Drainage of
Water encompassing the drainage pipes or overland flow-path will also be required. In this
regard a Development Permit for Operational Works shall be obtained.
Should evidence be provided to Council indicating that no additional ponding of stormwater
will occur on the adjoining properties the requirement for the drainage pipes, overland flow-
path and easement shall not apply.
58. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences or structures that border the development site. Fences that are affected shall be
replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard
any fences to be replaced shall be clearly shown on the plans submitted for Operational
Works approval.
8 of 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Negotiated Decision Notice - 010.2007.00000256.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 101 KB (small file)
- File type
No other editions are linked here.