Original source · versioned page text
Appendix 7 - Planning Scheme CodeResponses
Attached to the e-mail Development Application Appendices 4,5,6 & 7 (2 of 2) MCU16/0112 & OPW16/0209.
O7 Waste storage areas are designed to contain and S7.1 The waste storage area —
appropriately dispose of leakage from bins and a) is bunded and graded so that washwater and bin Bin storage area to be drained to sewer – refer to
wastewater from bin washing. leakage are drained to the sewer or an on-site engineering drawings
effluent disposal system via a gully within the storage
area;
b) has a bund wall with a maximum height of 100mm;
c) is serviced by a conveniently located hosecock
and backflow prevention device, and connected to a
water supply; and
d) is roofed or otherwise covered if the storage area
is—
2
i) more than 1m ; or
ii) storing wet waste; or
iii) storing other waste with a high potential to cause
pollution if washed or leaked from the bins, including
waste oil or putrescibles.
Appendix 7 – Planning Scheme Code Responses
Material Change of Use – Industrial Use Type 2
85 Rene Street, Noosaville – Lot 4 SP244573
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.