Appendix 7 - Planning Scheme CodeResponses
Attached to the e-mail Development Application Appendices 4,5,6 & 7 (2 of 2) MCU16/0112 & OPW16/0209.
allows for soft landscaping between buildings; for stormwater treatment and vehicle manoeuvring
d) allows for adequate area at ground level for and parking areas.
outdoor recreation, entertainment, clothes drying and
other site facilities; and
e) facilitates onsite stormwater management and
vehicular access.
O11 Site cover— Site cover equates to 0.375
O16 Within the Shire Business Centre Zone, the
maximum plot ratio for development within the
following precincts is —
f) Precinct E4- 0.6;
Flooding and drainage
O17 Buildings and other works are designed and S17.1 For new buildings or structures or additions of N/A – industrial use does not include habitable rooms
sited to— more than 50m2 gross floor area to an existing
a) provide flood free access to premises and flood building or structure, floor levels for habitable rooms
free habitable areas; are not less than the specified minimum floor levels;
b) allow only minor, short term and infrequent AND
flooding of non-habitable areas;
c) ensure carparking areas can be adequately S17.2 Where Council infrastructure is available— Stormwater discharges to existing Council
drained; a) any drainage (including buildings and yards) flows stormwater network.
d) ensure drainage does not adversely impact upon to that infrastructure; and
other premises; and b) the infrastructure has the capacity to accept any
e) ensure filling or excavation does not adversely additional loading;
impact upon other premises by—
i. causing ponding on the site or nearby land; S17.4 Car parking and maneuvering areas are Car parking areas at ground level.
ii. increasing flooding, which adversely affects the constructed at a level that permits the parking area to
safety or use of any land upstream and downstream; drain from the site by gravity means, without the
and need for mechanical pumping;
iii. adversely affecting the flow of water in any
overland flow path.
Division 24—Specific Outcomes and Probable Solutions for the Shire Business Centre Zone
Table 11.21
Column 1 Column 2 Response
Specific Outcomes Probable Solutions (if code assessable)
11.37 Consistent uses
O88 The following defined uses and use classes are The proposed development is a type 2 industrial use
consistent uses and are located in the Shire No solution provided
Business Centre Zone—
Appendix 7 – Planning Scheme Code Responses
Material Change of Use – Industrial Use Type 2
85 Rene Street, Noosaville – Lot 4 SP244573
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.