b. windows and other openings are permanently screened to a minimum height of
1.7 metres to avoid overlooking;
c. windows and doors use translucent glazing to obscure views; or
d. windows or balconies are offset by 45 degrees or more.
12. To ensure the privacy of the adjoining properties to the north is protected, the northern
elevation of the upper-level decks to Units 9 and 10 must be screened to a height of
1.7 metres or treated in such a way to obscure direct views into the habitable room
windows or private open space areas of the adjoining property.
Street Identification
13. The street address of the development must be clearly visible and discernible from the
primary frontage of the site by the provision of a street number and, where appropriate,
the building name.
Water & Sewer Connections
14. An underground connection to reticulated water and sewerage must be provided to the
development site in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
15. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
Fencing and Walls
16. Fencing to adjoining residential uses must be provided in accordance with the
approved plans.
17. Street fencing must be provided generally as shown on the approved plans.
18. The area of land between the fence and the front property boundary must be densely
landscaped to screen any fencing from the street. A mix of understorey and taller
species must be included.
Clothes Drying Areas
19. Each dwelling unit must be provided with access to an outdoor clothes line which is
screened from public view.
Community Management Statement
20. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the Building
Format Plan (or similar) to Council for compliance assessment.
21. All clauses and by-laws of the proposed Community Management Statement must
accord with the requirements of this Decision Notice and, in particular, must include
the following additional clauses:
a. The site includes a stormwater management and water quality treatment system.
b. The stormwater management and water quality treatment system must be
maintained in accordance with the Water by Design (2009) Maintaining
Vegetated Stormwater Assets (Version 1).
c. The full cost of maintaining the system in accordance with the Water by Design
(2009) Maintaining Vegetated Stormwater Assets (Version 1) must be included
in the proposed levies for each dwelling owner/body corporate.
Page 8 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.