INTEGRATED PLANNING ACT 1997

Development within the limits of a
port .
For more information refer to Guide 18, For
information about prescribed tidal work refer to
Guide 24. :
‘you answered “VES" to Q12, the appfication
tigers referral to the Port Authority.
The Port Authority s'a concurrence agency ifthe
= == developmentis—.  -~
* within 200m of a shipping channela of an enty
and exit shipping corridor for the port
© within 1000m of a swing basin, a commerciat
“shipping wharf, a mooring, anchorage or spol
~ grounds;
© within 1000m of a planned port facility
Identified in a tand use plan approved under *
* the Transport Infrastructure Act 1994.
(n all other situation the Port Authority Isan*
advice agency. *

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark'® and within the limits of a port
under the Transport Infrastructure Act 1994?

No

(21 YES - complete Part M of Form 1, or Part P of Form 1 Hf the work is prescribed tidal work -

 

Marinas : . .
For more Information refer to Guide't8, For
information about whether a marina is Prescribed
“tdal work refer to Gulde 24. The loca!

government is the assessment manager for al
prescribed tidal work,

Ifyou answered “YES" to Q13, the application

biggers referral to Queensland Fire and Rescue
. Servigg as an advice agency.

‘Tidal works In strateglc port land tidal
areas

For more information refer to Guide 18.

‘Unless You answered "NO" to 014, the refevant
is the assessment manager for the
‘ppldion and the Environmental Protection
“Agency (EPA) and Queensland Transport (QT)
"afe concurrence agencies for the appficaton.

Heritage

For further information refer to Guide 19°

Ifyou answered "YES" to Q15, the application
triggers referral to the Queensland Heritage
‘Council as concurrence agency for the
application.

Unless you answered "none of the above” to
Q15(b), fhe zeplicaton Invotves referrat to the

13.

—

15.

4,

Does the application Involve operational work that is tidal work for a marina‘? with more than 6
vessel berths?

&JNo

(21 YES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work

Does the application involve tidal works within a strategic port land tidal area’?
NO
CYes - - compte Part Mof Form 1

Does the application involve development in a heritage registered place as defined under the
Queensiand Heritage Act 1992?

No

(11 YES - complete Part Cof Form #

18(b The application involves: (tick applicable boxes)

(i) a material change of use assessable against the planning scheme and the lot shares a

 

as an advice common boundary with a protected area or registered place under the Queensland
agency for te appa Heritage Act 1992;
. CA (i) reconfiguring a tot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
EI (iii) none of the above.
Declared catchment areas 16. The application is In an area declared to be a catchment area under the Water Act 2000 and

For more information, including a Est of the
declared catchment areas within Queensland,
refer to Guide 13.

‘Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

tan agency other than NRW Is the assessment
snanager for the application, NRW is a
concurrence agency for the application in
Telation to this matter.

 

involves: (tick the applicable box/es)
CA(i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares:

C1 (il) - development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;

{iil) . none of the above

18 High water mark is defined in the Coasta! Protection end Management Act 1995 and means the ordinary high water mark al spring tide.
19 Marina is defined in the Transport Operations (Maritime Poltution) Regulation 1995.
20 Strategic port land dat areas are the areas generally 50 metres award of high water mark adjacent to strategic port fand.

Page §

 

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1836 - MCU - Detached House [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.