07/1836 - MCU - Detached House [As Published] · 132007.1836
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 Aprit 2007.
Operational work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work In
local government tidal areas refer to Guide 24. -
Unless you answered “none of the above" to Q9,
the application requires assessment by the
Environmental Protection Agency (EPA).
.., fan agency other than EPA I the assessment
* manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.
Local govemment is the assessment manager -
for a prescrbed tidal work.
The application involves operational work that is: ( tk the applicable box/es)
OW
Of
Di
& )
tidal work"° as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Fonn 1; oF
Udal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; OF
cartied out within a coastal management district under the Coastal Act and for - comptete
Part M of Form 1 if any box/es {a) to {i} below are ticked.
oO (@) « constructing or installing works in a watercourse between MHWS and HAT (le. > ~~ 7
other than those works in tidal wale) where the development has been determined not
to be assessable against the Water Act 2000 ;
constructing a canal’? intended to be connected to tidal waters;
constructing an artificial waterway;
reclaiming fand under tidal water,
disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
temoving or interfering with coastal dunes on land, other than State coastal land,
thatis in an erosion prone area and above high-water mark;
Oth)
OO@) _ constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
none of the above.
Do
De®
O@
De
Oo
O@
Operational work below high water
mark
For more information refer to Guide 18. For
more information about prescribed fidal work in
local government tidal areas refer to Guide 24,
Uniess you answered “none of the abave” to
Q10, the application triggers referral to
Queensland Transport (7) (Maritime Safety
Qld) as 4 concurrence agency.
Local govemmentis the assessment manager
“for aii prescribed tidal work.
Coastal management
For more information refer to Guide 18.
Unless you answered “none of the above" to
oN. the application requires assessment by the
fotection A (EPA).
' an agency other than EPA is the assessment
Manages for the application, EPA Is a
concurrence agency for the application In
relation to this matter.
10. The application involves operational work that is: { tick the applicable boxes)
11.
Oo
Dt)
tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; oF
tidal work that is prescribed tidal work" - complete Part P of Form 1; OF
O (iii) carried out within a coastal management district'® under the Coastal Act and for -
(iv)
C1 (2) disposing of dredge spoit or other solid waste material in tidal water —-complete Pant
Mof Form 1;
reclaiming land under tidal water — complete Part M of Form 1; oF
Oo)
(J (oe) constructing a canal", if the canal is assoclated with reconfiguring a lot - complete
Part M of Form 1;
none of the above.
The application involves: (tok the applicable box/es}
Qo
OW
D Gi)
Ow
(y)
a material change of use assessable under a planning scheme involving operational
work caried out completely or partly in a coastal management district*s
a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -
« the construction of a new premises with a GFA'® of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m?
reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
reconfiguring a lot"? assessable under schedule 8 of the IPA and In connection with
the construction of a canal’? - complete Part M of Form 1
hone of the above
40 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection end Management Reguaton 2003 and includes certain dat works completely or partly wilhin a focal government tidal area.
12 Canal means canal a3 defined under the Cosstat Protection and Management Act 1995
13 Tidal work is dafined in sch 10 of tha IPA.
14 Preserbed tial work Is defined in the Coastal Profection and Management Regutation 2003 and Inctudes certain tidal works completely or parlly within a local government Udal area.
15 Coastal management disticl is defined in sch 10 of the IPA and means a coast management district under the Coastal Protection and Management Act 1995, other than an atea declared as a
coastd management district under section 47(2) of thal Act.
16 GFA is defined In sch 14 of the IPA to maan the gross floor area. For a definibon of how to calculated GFA, go to the planning scheme agains! which the application Is being assessed,
47 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration Is associated with the construction of an artificial walerway, must be
accompaned by ihe application for the operational works to construct [he artificial waterway.
Page4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1836 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.