Council archive · source document
07/1836 - MCU - Detached House [As Published] · 132007.1836
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 18.0, 10 November 2006
Operational works In a tidal areaor |9. The application involves operational work that is: ( tick the applicable boxes)
coastal management district Forme. | - CI (i) tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed fdal work in local : Coastal Act) that is not prescribed tidal work — complete Part M of Form 1: or
Sire you anwar nea ee toca, the} Cli) tidal work that is prescribed tidal work'" other than in a canal? -complete Part P of Form 1; of
nl I
application requires assassment by the C1 (ill) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency (EPA). Part M of Form 4 if any box/es (a) to (i) below are ticked.
Fee aioe Eon ce (1 @) constructing or installing works in a watercourse between MHWS and HAT (ie. ”
agency for the application In retation to this matter. other than those works in tidal water) where the development has been determined not
Local government is the assessment manager for afl to be assessable against the Water Act 2000;
prescribed lidal work.
(1) (b) constructing a canal’? intended to be connected to tidal waters;
C(c) constricting an artificial waterway;
(1d) reclaiming land under tidal water;
(J €€) disposing of dredge spoil or. other solid waste material in tidal water;
C1 (f) interfering with quarry materia! on State coastal land above high-water mark;
(1(g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(1 (h) removing or interfering with coastat dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
{1 () constructing a bank or bund wail to establish a ponded pasture on land, other
. than State coastal land, above high-water mark; or
EX] (iv) none of the above.
Operational work below high water | 10. The application involves operational work that is: (tick the applicable box/es)
mark . 1
. cuide 18 C1 (i) tidal work's as defined under the Coastal Protection and Management Act 1998 (the
portation te tidal work if pad Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; or
government tidal areas refer to Guide 24, coy ge . . . 4 :
Unless you “noné ofthe above"to G10, 0 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF
the application triggers referral to Queensland 7 (ili) carried out within a coasta! management district's under the Coastal Act and for -
Transport (QT) (Maritime Safety Qld) as a '
concurrence agency, disposing of dredge spoil or
* Local government is the assessment manager for all
prescribed tidal work.
id waste material in tidal water - complete Part
fete Part M of Form 1; or
anal is associated with reconfiguring a lot - complete
Coastal management 11. The application involves: (tick the applicable box/es)
he ora information refes to ne 7 (1 (i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above" to Q11, ‘ i , istrict?5
the apleaton requires assessment bythe work carried out completely or partly in a coastal management district
Envi (EPA), O (ii) a material change of use assessable under a planning scheme involving building
Ian agency other than EPA is the assessment work, carried out completely or partly in.a coastal management district that is -
manager for the application, EPA is a concurrence
agency for the application in retation to this matter. , + the construction of a new premises with a GFA" of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m2
Dili) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district :
C1 (iv) reconfiguring a lot'® assessable under schedule 8 of the IPA and in connection with
the construction of a canals ~ complete Part M of Form 1
1 (v) none of the above
10. Tidal work is defined in sch 10 of the IPA. .
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canat means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
"15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, ather than an area declared as a
coastal management district under section 47{2} of that Act. .
16 Canal means canal as defined under tha Coastal Protection and Management Act 1995
17 GFAis defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the apptication is being assessed.
18 Under 5117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1836 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.