Skip to the record
The only place to find full transcripts.

Council archive · source document

07/1836 - MCU - Detached House [As Published] · 132007.1836

of 41

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997
Development within the Hmits of a

- port

For mora information refer to Guide 18. For
information about prescribed tidal wark refer to
Guide 24,

If you answered "¥.ES” to O12, the colon

triggers referral to the

The Port Authority is a concurrence agency if the

development is —

within 200m of a shipping channel or an entry
and exit shipping corridor for the port.

© within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

© within 1000m of a planned port facility identified
in aland use plan approved under the Transport
Infrastructure Act 1994,

in all other situation the Port Authority is is an advice

agency.

Marinas

For more information refer to Guide 18. For.
Information about whether a marina is prescribed
tidal work refer to Guide 24, The local government
is the assessment manager for all prescribed tidal
work,

Ifyou answered “YES” to Q13, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency.

Tidal works in strategic port land tidal
areas

For more information refer to Guide 18,

Unless you answered “NO” to Q14, the relevant Port
Authority is the assessment manager for the
Bepicaion and the Enviconmental Protection
Agency (EPA) and Queenstand Transport (QT) are
concurrence agencies for tha application.

Heritage

For further information refer to Guide 19,

Ifyou answered "YES" to Q15, the application
triggers referral to the.
as concurrence agency for the application.

113.

IDAS Assessment Checklist, Version 18.0, 10 November 2006
Does the application involve development below high water mark’? and within the limits of a port
under the Transport Infrastructure Act 1994?

No

1 YES -compiete Part M of Form 1, or Part P of Form 4 if the work is prescribed tidal work

Does the application involve operational work that is tidal work for a marina? with more than 6
vessel berths? :

KINO

[YES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work

14. Does the application involve tidal works within a strategic port land tidal area2!?

INO

(1 YES - complete Part Mofform 1 -

Does the application involve develo ritage registered place as defined under the
Queensland rartigg A 19e8 a .

15.

     

 

Declared catchment areas

For mora information, including a list of the declared
catchment areas within Queensland, refer to Guide
13.

Unless you answered “none of the above" to Q16,
the application requires assessment ay ts the

 

(Fan agency other than NRMW is the assessment
manager for the application, NRMW Is a
concurrence agency for the application In relation to
this matter. -

 

 

involves* (tick the epplicable box/es) -

C1 (i) reconfiguring a fot if any lot resulting from the reconfiguration is less than 16 hectares;
Oi) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994:
EX (ii) none of the above

 

Contaminated land

Applications involving material change of use and/
of reconfiguring 2 lol may trigger this referral.

For more information refer to Guide 5,

Unless you answered “none af tha above" to Q17,
the application raquires assessment by the
Environmental Protection Agency (EPA), If an
agency other than EPA is the assessment manager
for the application, EPA will be a concurrence
agency for the application in relation to this matter.

 

The application involves: (tick the applicable box/es)

Oti (i) reconfiguring a lot for which all of part of the premises are —
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 - :
+ item 5, including the exemption otherwise provided for by paragraph (d);
* item 6, including the exemption otherwise provided for by paragraph (e); or
© item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b) in-an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 4
CI (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b) assessable against the planning scheme and if all or part of the. premises is in an area

for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1

EI (ili) none of the above

17.

 

19 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
21 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Used in these records

About this file

File size
3.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1836 - MCU - Detached House [As Published].pdf · 3.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.