Original source · versioned page text
Fauna Management Plan v1 - Lake MacDonald Drive, Cooroy
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnFauna Management Plan v1 NCES REF: J000662 Lot 101 on SP142407, Lot 140 on MCH978, Lot 3 on RP137375, Lot 2 on RP852009 and Lot 8 on RP160703 – 27 Wilgee Court, Cooroy 1 INTRODUCTION 1.1 Background North Coast Environmental Services have been commissioned by to prepare a Fauna Management Plan to manage fauna during and prior to vegetation clearing proposed to be undertaken on land formally known as Lot 101 on SP142407, Lot 140 on MCH978, Lot 3 on RP137375, Lot 2 on RP852009 and Lot 8 on RP160703, located at 27 Wilgee Court, Cooroy (referenced hereafter as ‘the site’): The habitat removal predominantly consists of regrowth vegetation which is required to be removed in order to carry out bulk earthworks on the site to accommodate an approved rural-residential development (16 new residential lots). The majority of intact vegetation within the site is proposed to be retained. 1.2 General Responsibilities All fauna management services undertaken within the site are to be conducted in accordance with all applicable and relevant local, State and Commonwealth government guidelines and legislation. A suitably qualified and appropriately experienced fauna spotter/catcher is to be employed to undertake the fauna management services prior to and during all clearing activities. The Project Manager is responsible for ensuring that all persons directly and indirectly associated with the fauna management activities understand the vegetation and fauna management measures prescribed within this Fauna Management Plan. Failure to comply with the management measures prescribed herein may result in the contravention of local, State and Commonwealth legislative responsibilities. The Project Manager should contact Council’s environmental staff where doubt arises over any vegetation removal/habitat disturbance situations before the activity in question proceeds. © 2020 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.