Decision Letter - Change to an Existing Approval - 010.2006.00000138.002 [As Published] · 132006.138.02
2006/138
11. The proposed development shall have all kitchen, laundry and bathroom fittings that comply
with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
Dishwashers and washing machines are excluded from this requirement.
12. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
13. Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
14. The requirements of this development approval are to be effected, prior to the use of the
premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
this approval to effect compliance with conditions.
15. The Development Permit for a material change of use of premises lapses if the use has not
happened by 12 July 2013, unless an application to extend the currency is approved by
Council.
16. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for Building Works.
Building Services
17. Fencing to the swimming pool must comply with the Queensland Building Act 1975 Part 3 (as
amended) and Part 5 of Standard Building Regulation 1993 in all respects. Direct access from
the dwelling to the pool enclosure is not permitted.
Land Development
Vehicle Access
18. A vehicular access driveway to serve the property shall be constructed from the Weyba Street
frontage of the site generally in accordance with the Driveway Centre Profile on Drawing No
16078-OW1 dated January 2006 by SCG Consulting Engineers, except as modified herein.
19. The driveway together with the footpath shall be designed by qualified engineer and
constructed to Council’s design standards and to grades that prevent vehicles from scraping
and/or bottoming whilst also allowing pedestrians movements along the footpath without any
level difference. Should any driveways be constructed to grades that do not comply with
AS2890.1-2004, Council will require that the driveway be removed and reconstructed to levels
that do comply.
Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
to have the footpath continue at a constant grade to minimise the potential for pedestrians to
trip or fall.
Carparking
20. Carparking shall be provided within the site generally as shown on Drawing No 0525.01 (A)
dated November 2005 prepared by KIDD & Co, except as modified herein.
21. A minimum of 4 covered carpark spaces shall be provided on site.
22. The carparking area shall be designed to comply with the provisions of AS 2890.1-2004 for
user class 1A with allowance for vehicles to enter and leave the site in a forward gear and with
a minimum head clearance (headroom) at any point of 2.2m.
Page 3 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - 010.2006.00000138.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 188 KB (small file)
- File type
No other editions are linked here.